2013 Environmental Objectives & Targets Objective
Target Energy
Reduce energy/electrical consumption via heating, air conditioning, ventilation, and lighting operational adjustments, retrofits, and technology upgrades. Recent accomplishments include building control system upgrade, variable frequency drives, chiller economizer, demand control ventilation, North & South Tower T-8 lamp and electronic lighting ballast retrofit.
Ongoing; Facilities and IT Goals and Objectives, reduce energy/electrical consumption by 3% from previous year.
Water conservation
See 2013 Sustainability Goals Recycling
Reduce solid waste disposal into landfill via recycling, reuse, and less paper generation. Recycling programs includes single sort paper/metal/plastic, cardboard, batteries, copier toners, printer ink cartridges, computer hardware, and production scrap. Non-recycled trash is reused via local steam plant incineration and power generation to Redstone Arsenal.
Per Facilities and Operations Goals and Objectives, increase solid waste landfill diversion rate of 100%.
Recycle all field returned product and IT scrap equipment
100% Ongoing
Awareness Communications/Integration/Training Awareness Training: Increase employee awareness of EMS Program and enhancements at the following locations: Headquarters and satellite locations ADTRAN-Bluesocket ADTRAN-VBA
100% new hire. Ongoing
EMS Policy Training: Review revised policy
100% new hire. Ongoing
Global Site and Manufacturing Audits: Conduct 8 or more assessments
Q4 2013
BBA Integration: 100% integration
Q2 2013
Full Integration of ISO 14001 Team and Green Team
Q3 2013 Meeting to discuss integration with Green Team and EMS leaders [Q1 2013] Review ISO 14001 documentation to integrate Green Team [Ongoing] Assign ISO 14001/Green Team Coordinator [Q2 2013]
Product Based EMS Determine requirements for initiating a product based EMS Establish global ISO 14001 team to identify requirements for obtaining a certified ISO 14001 product based EMS by 2014. Form GEN43.3-3, Rev G. ADTRAN Environmental Objective Review, Huntsville, AL (Printout is not a controlled copy)
07/05/13
Page 1 of 2
2013 Environmental Objectives & Targets REVISION
DATE
AUTHOR
CHANGE DESCRIPTION
A B C D E F G
05/28/10 08/12/11 09/26/11 02/28/12 03/29/12 04/26/12 06/08/12
G. Giles G. Giles G. Giles P. Jackson P. Jackson P. Jackson P. Jackson
H
05/28/13
I
7/1/13
P. Jackson/G. Giles/L. Gilbreath P. Jackson/G. Giles/L. Gilbreath
New Updated to reflect 2011 objectives, updated Awareness Training and EMS Policy Training. Correct Header: was showing as 2010 and should have been changed to 2011. Updated to reflect 2013 objectives. Included reference to Sustainability Goals, and added new hire training requirements. Updated the water conservation objective to match with Sustainability’s Goals. Merged recycling goal for IT scrap and field returned product scrap. Included an objective for BBA integration. Review of 2013 Objectives and Targets. Review was delayed due to business needs and waiting on input from the Green Team. 2013 Objectives include increased site assessments. Update 2013 Objectives and Targets to reflect Green Team 2013 goals.
Form GEN43.3-3, Rev G. ADTRAN Environmental Objective Review, Huntsville, AL (Printout is not a controlled copy)
07/05/13
Page 2 of 2