Resume of SUBASHCHANDRABOSE.R
+65 83031670
[email protected]
Dynamac Engineering Services Pvt Ltd 45 Gul Road, Singapore.
BRIEF SUMMARY Around 11 years of experience in Structural fabrication, Erection, and Involved in Project Execution Activities related to Power Plant, Petrochemical Refinery’s and FPSO Modules Structural And FPSO Turret Structure, Pipe Racks, Metering Skids well versed with ASME, API and AWS D 1.1 Standards and all outfitting works. STRENGTHS Professionalism:-
In dealing with Owners, Clients, Architects, Sub Contractors, Consultants and craft people & Co- Workers.
Motivation:-
To continually learn & take on added responsibilities while Maintaining a positive attitude. Develop expertise in each skill areas Exposed.
Judgment:-
Knowing how to respond to a problem in a manner consistent with the Company’s primary interest.
Planning:-
Looks ahead & organizes activities to stay on top of the projects needs.
Initiatives:-
Seek out opportunities to contribute. Pushes to the envelope, raise the Bar. Track each task and opportunity.
EDUCATION B.E., Mechanical & Production – 1999-2003 in Annamalai University Chidambaram. TamilNadu. M.B.A., International business – 2004-2006 in Annamalai University (Distance Education) Chidambaram. TamilNadu. COMPUTER PROFICIENCY
Operating System Packages Soft ware
EXPERIENCE:
: WINDOWS 8 : MS OFFICE 2010 : Pro-E 2001
EMPLOYER NAME
FROM
TO
DESIGNATION
DYNAMAC ENGINEERING SERVICES PVT LTD,
Oct’09
Till Date
Senior Supervisor
June’07
Sep’09
Engineer
GANGES INTERNATIONALEPVT LTD, PONDY,INDIA.
June’05
May’07
Engineer
AMM – NEYVELI.,TAMILNADU,INDIA.
Nov’03
May’05
Engineer
SINGAPORE. KIRLOSKAR CONSTRUCTION AND ENGINEERS LTD, CHENNAI,TAMILNADU,INDIA.
PRESENT EMPLOYER: At present working as an Senior Supervisor – Projects in DYNAMAC ENGINEERING SERVICES PVT LTD.,
Working as an Senior Supervisor – Projects in DYNAMAC ENGINEERING SERVICES PVT LTD. .An ISO 9001:2000 , ISO14001:2004, ISO18001:1999 Company involved in construction of FPSO Modules, Pipe racks, FPSO Turret Structure, FSO Skids. Projects Handled in Dyna Mac:Client
: BP Exploration Ltd.
Consultant
: MODEC INTERNATIONAL INC.
Project
: BP ANGOLA (PSVM) FPSO
Client
: HONG . LONG .
Consultant
: BUMIARMADA.
Project
: TGT FPSO ( TGT FIELD DEV)
Client
: CHEVRON THAILAND EXPLOARTION AND PROCESS.
Consultant
: EMERSON.
Project
: FSO ERAWAN 2 METERING SYATEM.
Client
:OSX An EBX Group of Company.
Consultant
: SBM (SINGLE BUOY MOORING INC).
Project
: OSX 2 FPSO.
Client
: BP Exploration Ltd.
Consultant
: SBM (SINGLE BUOY MOORING INC).
Project
: 1. SKARV TURRET EQUIPMENT ROOM. 2.
DEVELOPMENT
LOCAL
BP QUAD 204TURRET
Client
:PETROBRAS NETHERLANDS B.V.
Consultant
: SBM (SINGLE BUOY MOORING INC).
Project
: 1. 2.
TURRET
FPSO CIDADE DE MARICA. FPSO CIDADE DE SAQUAREMA.
Client
: KRAKEN .
Consultant
: BUMIARMADA.
Project
: KRAKEN FPSO
Responsibility Ensure compliance with the prescribed Company, clients and other standards. Forecast resource requirement with project manager. Thoroughly understand the contractual scope of work and raise variation requests for any work not covered as part of the work scope but is required to be undertaken for job completion. Involved in fabrication works of Pipe racks, Modules, Water injection skids, Compressor skids, Topside FPSO structure. Material takes off for the projects involved. Analyzing the scope and volume of work. Analyzing man power loading. Preparation of sequence of work and operations. Educating workers on safety regulation and requirement. Fabrication and erection of Local Equipment Room (LER). Fabrication and erection of out fittings. Follow IFC drawings, Q, Project Schedule Plane. Coordinating with QC and Engineering and all aspects. Coordination with client and sub cons, Completion of jobs on Schedule.
PREVIOUS EMPLOYMENT 1: At present working as an Engineer – Projects in KIRLOSKAR CONSTRUCTION AND ENGINEERS LTD.,
Working as an Engineer in Kirloskar Constructions and Engineers Ltd.An ISO 9001:2000 , ISO14001:2004, ISO18001:1999 Company involved in construction of Refineries, construction of Plant.
Projects Handled in Kirloskar:Client
: Indian Oil Corporation Ltd (IOCL) .Haldia refinery,Haldia,(W.B)
Consultant
: Lurgi India ltd
Project
: SRU IV Unit (Sulfur recovery unit ) 1800 MT Steel Structural Fabrication& Erection
Owner
: Indian Oil Corporation Ltd, Panipat refinery, Panipat,Hariyana.
Project
: Dadari TO Panipat LNG pipe line (DPPL) 32” Dia pipe Line.
Owner
: Chemplast Sangmar Ltd., Cuddalore.
Client
: Jacob’s Engineering India Ltd.
Project
: 1400 MT Steel Structural Fabrication& Erection
Responsibility Planning and executing the work in fabrication and erection as per our schedule and client requirement. Prepare the material requirement. Prepare the cutting plan of required jobs as per our material availability. Implement project construction quality control requirements including inspection and testing of installations. Inspect all fabrication jobs from first stage to final stage as per the drawing. Inspecting the weld ts before, during and after welding. Coordinate with client and consultant for inspection activities and other follow-up conditions. Allocate the erection team & monitoring erection schedule. Monitoring of all consumables.
Study the drawings carefully and handle the work as per our erection sequence and erection methods safely. Follow the safety rules and regulations in fabrication and erection areas. Reporting daily work progress to the project manager and planning for the next day work activities. Develop punch lists of incomplete work. Provide technical direction to supervisors and foreman. Prepare the as built documents and inspection records. Perform subcontracts coordination including istration of project back charge.
PREVIOUS EMPLOYMENT 2: Working as an Engineer in Ganges International Pvt. Ltd., An ISO 9001:2000 Company involved in Steel tube production, Fabricating & Erection of telecommunication towers. Projects Handled in Ganges International Pvt Ltd, Owner
: BSNL, AIRTEL, HUTCH, RELIUNCE
Project
: GBT,RTT, Tower fabrication & erection
Responsibility Work Planning and Scheduling. Planning and Executing the fabrication inspect the dimension checking. Allocate the erection team & monitoring erection schedule. Segregation of material checking. Lead to manage and motivate people, able to complete projects in time, quality and result oriented. Fabrication , Erection & Testing of Towers. Coordination of our staff, subcontractors and workers. PREVIOUS EMPLOYMENT 3: Working as an Engineer in A.M.MANICKAM – Neyveli. involved in construction of Civil Works & structural jobs for Neyveli lignite corporation. Tamilnadu, india. PROJECT with AMM: Projects Handled in AMM, Owner
: Neyveli lignite corporation (NLC), Neyveli,Tamilnadu,India.
Project
: Erection and Commissioning of 4420 3/m Spreaders & Mobile
TransferConveyor for mine IA, Client
: Larsen & Toubro Ltd.,
Responsibility
: Tr. Engineer
Work Planning and Scheduling. Segregation of material checking. Co-ordination with Clients & Sub Contractors. Lead to manage and motivate people, able to complete projects in time, quality and result oriented.
PERSONAL DETAILS: Name
: Mr., SUBASHCHANDRABOSE
Father’s Name
: Mr.S.Raja rammohan (Late)
Date of Birth
: 30th june’1982
Marital Status
: Single.
Linguistic Proficiency
: English & Tamil.(Speak & Write)
port Details
: No: F 7888934
Place of issue
: Chennai
Date of issue
: 30.05.2006
Valid up to
: 29.05.2016
S
: G6332601T
DECLARATION I hereby declare that the details furnished here are true to the best of my knowledge and belief.
(SUBASH CHANDRABOSE.R)
Date: