Page 1 of 14
PRODUCTION PROCESS OF ASHOK LEYLAND
ABSTRACT: Theme of the paper is to deal with the production process and operation involved in the commercial vehicle manufacturing company ASHOK LEYLAND. At the end of reading you get the idea regarding the manufacturing or production process, operations, supply chain management undertaking in the respected vehicle manufacturing company.
PRODUCTION PROCESS IN ASHOK LEYLAND
Page 2 of 14
INTRODUCTION: Ashok Leyland is a commercial vehicle manufacturing company based in Chennai, India. Founded in 1948, the company is one of India's leading manufacturers of commercial vehicles, such as trucks and buses, as well as emergency and military vehicles. Operating six plants, Ashok Leyland also makes spare parts and engines for industrial and marine applications. It sells about 60,000 vehicles and about 7,000 engines annually. It is the second largest commercial vehicle company in India in the medium and heavy commercial vehicle (M&HCV) segment. With enger transportation options ranging from 19 seaters to 80 seaters, Ashok Leyland is a market leader in the bus segment .The company claims to carry over 60 million engers a day,
more people than the entire Indian rail network. In the trucks segment Ashok Leyland primarily concentrates on the 16 ton to 25 ton range of trucks. However Ashok Leyland has presence in the entire truck range starting from 7.5 tons to 49 tons. The t venture announced with Nissan Motors of Japan would improve its presence in the Light Commercial Vehicle (LCV) segment (<7.5 tons). In 1968, production of the Leyland Titan ceased in Britain, but was restarted by Ashok Leyland in India. The Titan PD3 chassis was modified, and a five speed heavy duty constant-mesh gearbox utilized, together with the Ashok Leyland version of the O.680 engine. The Ashok Leyland Titan was very successful, and continued in production for many years.
PRODUCTION PROCESS IN ASHOK LEYLAND
Page 3 of 14
ACHEIVEMENT’S OF ASHOK LEYLAND:1966
Introduce full air brakes.
1967
Launched double-decker bus.
1968
Offered power steering in commercial vehicles.
1979
Introduced multi-axle trucks.
1980
Introduced the international concept of integral bus with air suspension.
1982
Introduced vestibule bus.
1992
Won self-certification status for defense supplies.
1993
Received ISO 9002.
1997
India's first CNG powered bus ed the BEST fleet.
2001
Received ISO 14001 certification for all manufacturing units.
2001
Launched hybrid electric vehicle.
MANUFACTURING PLANTS OF ASHOK LEYLAND: Ashok Leyland has seven manufacturing plants: 1) Ennore 2) Hosur: Unit 1 3) Hosur: Unit 2 PRODUCTION PROCESS IN ASHOK LEYLAND
Page 4 of 14
4) Hosur: Unit 2A 5) Alwar 6) Bhandara 7) Pantnagar
Ashok Leyland products. 1:-Buses Leaders in the Indian bus market, offering unique models such as CNG, Double Decker and Vestibule bus.
3:- Engines:-
2:-Trucks:-
Diesel engines for Industrial, Genset and Marine applications, in collaboration with technology leaders.
Pioneers in multi axle trucks and tractor-trailers.
PRODUCTION PROCESS IN ASHOK LEYLAND
Page 5 of 14
Largest provider of logistic vehicles to the Indian army.
4:- Defense & Special: -
Mission Achieving Customer Delight Excellence in technology and engineering Continuous Improvement and Learning Teamwork, training, transparency, people - based management and internal
customer satisfaction.
Protection of working environment that promotes safety and health of our employees.
Vision To become Customers’ first choice, by focusing organizational energy on understanding and delivering on their need for state-of-the-art technology, cost and quality benchmarks, and overall relationship, which they expect from a world class supplier. PRODUCTION PROCESS IN ASHOK LEYLAND
Page 6 of 14
S OF ASHOK LEYLAND PRODUCTS: INDUSTRIAL :
Industrial includes transporter, Logistics Company, coal an mining industry and other industries etc.
PUBLIC :
Public includes individual or enger transport.
GOVERNMENT :
Government includes state and central transport like DTC UPSRTC and other.
DEFENSE :
Defense includes Indian army trucks, tanks and transpo buses.
PROCESS FLOW CHART OF ASHOK LEYLAND purchase of raw material
components machined
rough milling
drilling
finish milling
washing
boring
PRODUCTION PROCESS IN ASHOK LEYLAND finish products
end milling
assembly of bearing caps
Page 7 of 14
CRANKSHAFT:
-
CRANKSHAFT is attached with a gear and is fixed to the bottom of the cylinder block by bearing caps.
CAMSHAFT: CAMSHAFT is attached with a timing gear and is fixed in the required space provided in the cylinder block.0
INPUT AND OUTPUT PROCESS INPUTS:• Collecting information about the parts of truck and buses, which Ashok Leyland is going to produce. • Production system of Ashok Leyland. • Production Strategy of Ashok Leyland (Strategy for HCV and LCV is different.) PROCESS PLANNING:• Ashok Leyland selects the process for production. • Study of new product which Ashok Leyland is going to produce and study of process.
PRODUCTION PROCESS IN ASHOK LEYLAND
• Study of Machinery, which is used to produce the product.
Page 8 of 14
OUTPUTS:• Final product is prepared(Product is with new technology) • Hybrid features of new product. *Hybrid engine. *HybridMANAGEMENT model. OPERATIONAL
Ashok Leyland is trying to improve efficiency and production quality, reduce costs and increase customer satisfaction.
Among the means company is adopting just-in-time inventories system.
Strategic
Sourcing:
Technology
Strategic sourcing recognizes
Upgradation:
that
including
Company has a strong focus
innovative suppliers, are a
on technology upgradation in
valuable
an
order to meet the growing
organization and focuses on
demand for newer & better
reducing waste or non-value-
models.
people, part
of
added costs.
The upgradation
PRODUCTION PROCESS IN ASHOK LEYLAND
The
technology initiative
Page 9 of 14
the Company expects
are carried out under stringent
to produce more fuel
simulated
efficient vehicles with
replicate the most treacherous
robust designs which
landscapes.
are globally best in
Innovations:
their class.
Leyland product development
World-class
conditions
that
Ashok
successes have come from a offer
keen sense of anticipation and
world-class technology that is
attentiveness. The company
relevant and affordable to the
initiated
Indian
the
alternative fuels well before
philosophy that drives R&D
legislative debate had even
at Ashok Leyland.
begun in the country.
Value to the Customer:
Best practices: The new
The
lines, apart from being state-
Technology:
To
customer
immediate
is
R&D
research
into
priorities are to pro-actively
of-the-art
in
address
machines
and
tools,
safety
and
many
of also
environmental issues, harness
incorporate
global
and adopt technologies that
industry best practices. The
provide value to the customer
automated
coolant
in an atmosphere enabling
management
system
creativity and innovation.
significantly reduces coolant
Test Tracks: but Company
consumption.
R&D is not confined within
The
walls. It extends to the test
Execution
tracks as well. Rigorous tests
allows for online monitoring
PRODUCTION PROCESS IN ASHOK LEYLAND
Manufacturing System
(MES)
Page 10 of 14
of all operational parameters
and crankshafts lines. Robots
such as breakdowns, tool
are used for ‘handling’ hot
change
axle arms and axle beams.
and
power
consumption - both current
Compact and versatile:
status and history.
A
Automation:
New
significant
extremely
automation
“Transformation
minimize
to
capacities, the new lines are
benchmarks have been set in to
addition
versatile. training
activities that cause human
becomes
fatigue or pose hazards and
movement
achieve
accustomed work situations
speed.
Gantry
Systems are used for axle-
crucial of
in
such
men
from
to a whole new set-up”.
beam, axle arm, camshafts
PRODUCT SUPPLY CHAIN It has been found that the
supplier
automobile
program as part of its world-
giant
Ashok
development
Leyland ltd, chennai has got
class
one of the very successful
management.
PRODUCTION PROCESS IN ASHOK LEYLAND
supply
chain
Page 11 of 14
Manufacturer
Dealer
Customer
CMD identifies the vendors, rates the vendors based on received from Supplier Quality Assurance Cell, sends drawings / specifications, calls for quotes with detailed break-up of operation-wise costs, and negotiates the price at which the parts will be supplied. Ashok Leyland considers its vendors as partners in
progress and believes in establishing mutually beneficial relationships. Ashok Leyland provides necessary technical assistance in the form of Project and Production Engineering, to maintain quality levels. In addition, where required, Ashok Leyland also helps vendors financially.
DRAWBACK:
PRODUCTION PROCESS IN ASHOK LEYLAND
Page 12 of 14
As Ashok Leyland is giving it’s best to its customer but then also there are some drawbacks: The domestic sales of the company are not up to the mark. Ashok Leyland has not got a foothold in the luxury trucks segment in its domestic market. Ashok Leyland
have low cost advantage over its
competitors, once the competitors find out the low cost production methodology then there will no competitive advantage. CNG buses of Ashok Leyland are also not playing well on the roads, some or other break down creating problem for them.
Some of the automobile company is going to launch HMV to give competition to Ashok Leyland and till now Ashok Leyland not got any alternative to comptite with it.
PRODUCTION PROCESS IN ASHOK LEYLAND
Page 13 of 14
FEATURES OF THE COMPANY: As we know through this project that Ashok Leyland is also one of the leading automobile manufacturers in the world and it also came to know that:-
Provide World technology:-
class
Provide Value to the customer:-
To offer world-class technology that is relevant and affordable to the Indian customer is the philosophy that drives R&D at Ashok Leyland. Over the years, this philosophy has been translated time and again into products that seamlessly integrate international technology with local needs. "The role of R&D is central in fulfilling the companywide commitment to total customer satisfaction" states Mr. R. Seshasayee, Managing Director, and adds that the increased infrastructural and financial expresses the company's determination to become self-reliant in R&D.
The immediate R&D priorities are to pro-actively address safety and environmental issues, harness and adopt technologies that provide value to the customer in an atmosphere enabling creativity and innovation. Powering those who "engineer tomorrows" with an enabling infrastructure has been top priority for the company.
PRODUCTION PROCESS IN ASHOK LEYLAND
Keep innovating there product:Ashok Leyland product development successes have come from a keen sense of anticipation and attentiveness. The company initiated research into alternative fuels well before legislative debate
Page 14 of 14
had even begun in the country. The result was the implementation of CNG technology ahead of the rest
PRODUCTION PROCESS IN ASHOK LEYLAND
promising a breath of fresh air for polluted cities. *********