MODULE
TITLE Basic
VolumeI
General Utilities Create Equipment
Modify Equipment
VolumeII
Pipe work Modeling Modify Pipe Routing Pipe Route Checking
MODULE TRAINING GUIDE CONTENT SUMMARY
DURATION /Hrs
PRE/ REQUISITES
Introduction about Piping & PDMS, Project, Modules, , etc., Working with 3D view, Using command window, Clash detection, Representation tools. Creating Primitives, Creating Standard Equipment, Equipment Utilities, Attributes, Attributes Global, Hierarchy, Create Primitives using command window, Dragging and Orientation of Equipment. Modifying Standard Equipment, Properties, Equipment Specification, Nozzle Specification, Positioning Equipment, Model editor, etc., Pipe Routing, Creation of Piping Components, Orientation of Pipe, Pipe Routing Using command line, Connection ref, etc., Dragging of Pipeline, Replacing Pipe Components, Pipe Spec. Modification, Sloping and Falling of Pipeline, etc., Data Consistency Checker, Isometric Production, Rectification of Pipe Routing Error.
2
None
6
None
22
Knowledge of Primitives
20 15
15 3
Kagira Drawing Solution #21A, First Floor, Ramalinga Nagar, OMR (SRP Tools), Kottivakkam, Chennai600 041 Ph: 0442454 2454, Cell: 9500 100 966/ 9940 582 820 www.kagira.com
Knowledge of Pipe Specification, Ratings
Kagira Drawing Solution PDMD Training Modules and Guides
VolumeIII
Creating a Sections, Orientation of Beams, t Specification, Modifying Section Profile, Base Beams & Columns Plate Creation, Material Apply, Weight calculation, Section Justification, Definition, etc., s & Plates
Creating s, Negative Extrusion, Modifying , Fittings, Penetration, etc.,
5
Walls & Floors
Crating Walls & Floors, Applying Fittings for Walls & Floors, Mitre End Connections at Wall Ends, and Extension of Walls & Floors Length.
8
ASL Modeller Hangers & s VolumeIV
15
HVAC
Cable Tray
Creating a Platform, Stairs, Ladders, Floor Penetration, Modifying Platform ts, Positioning of Platform, Stairs, and Ladders. Creating of s in Pipe Rack, Modifying the Hangers & s in the Pipe Rack. Creating Inline Plant Equipment like AHU, Duct Routing, Applying Grid and Tiles on grid, Specification Generator, CG and Surface area Calculation, etc., Crating Electrical Cable Trays and Modification, Modification of Cable Tray Specification.
Knowledge of Structures and Volume‐I
10
7
Knowledge of s and Volume‐II
8
Knowledge about the HVAC System
7
Knowledge of Cable Tray and Volume‐II
Kagira Drawing Solution #21A, First Floor, Ramalinga Nagar, OMR (SRP Tools), Kottivakkam, Chennai600 041 Ph: 0442454 2454, Cell: 9500 100 966/ 9940 582 820 www.kagira.com
VolumeVI
VolumeV
Kagira Drawing Solution PDMD Training Modules and Guides
Drafting
Generating 2D View from 3D, Creating Labels, Dimensioning, Auto Drawing Production, Copy of View, View Alignment, Text Creation and Modification, Scaling of Drawing, Schedule and Tagging, Interface to Other soft wares like Auto CAD, Micro station.
Creating Iso metric Drawing, Convert to DXF, Generate BOM, and Preparing Isometric Iso generation Fabrication Drawing. Quick Reports, Nozzle Schedule, Pipe MTO, Steel Report Generation MTO, Valve Schedule, Report Study. Commands are used to Create the Utilities like PDMS Commands Primitives, Equipment, Pipe work, etc.,
Total Time
10
Knowledge of Drafting
8
Knowledge of Volume‐II
10 4
General Knowledge of Volume‐I, II & III Basic Design
175 Hrs