COSMOPLAST INDUSTRIAL COMPANY L.L.C HDPE PRESSURE PIPES AND FITTINGS PREQUALIFICATION
MAIN CONTRACTOR PROJECT
-
ARABIAN CASTLES FOR GENERAL CONTRACTOR SMU HANGER & SHOPS
INDEX
1. PRODUCT ITEMS:
1. HDPE PRESSURE PIPES AND FITTINGS
2. RELATED DOCUMENTS:
1. Company Profile 2. Trade License/ISO Certificates 3. Organizational Chart 4. List of Projects 5. Product Catalogues 6. Test Certificates/Technical Data Sheet 7. Previous Approvals
2. RELATED DOCUMENTS:
1. COMPANY PROFILE
COMPANY PROFILE
Introduction
08/02/2017
Branch of Interplast Co. Ltd (www.interplast-ksa.com) was established in Riyadh in the year 2007 to manufacture electrical accessories, conduits and PVC/PE/PPR pipes as well as fittings. In 2017, for strategic reasons, it acquired Cosmoplast Pipeline Systems division so as to serve the regional markets as a combined single source of electrical and mechanical systems for the Construction Industry. Major brand names include ‘EDISON’ Electrical Accessories, ‘DECODUCT’ Electrical Cable Management Systems and ‘COSMOPLAST’ Pipeline Systems.
Workforce Year of establishment Capacity of plastic conversion
Interplast - KSA
Interplast Group - UAE
200 Employees (extrusion/injection/assembling/com pounding) 2007 50,000 MT / Year (extrusion / injection / compounding)
3700 Employees (extrusion/injection/assembling/compou nding) 1983 200,000 MT / Year (extrusion / injection / compounding)
Harwal Group Interplast Branch, with its head office in UAE, is part of the Harwal Group of Companies founded in 1938. Cosmoplast Industrial Company WLL in UAE, established since 1976, is a fully owned subsidiary of Interplast Company Ltd. with a branch in KSA. The Harwal Group has an international workforce of 6600 , with its products sold in over 65 countries. Its 40 manufacturing facilities are spread over KSA, UAE, USA and CIS countries with distribution facilities in Europe and USA. Its production and conversion capacity in the GCC is over 200,000 tons of plastic materials and 200,000 tons of Steel, Aluminum and Wood Products, which encom:
Cosmoplast Pipeline Systems made by Cosmoplast and Interplast in Riyadh and Dubai. Edison and Decoduct Electrical Products made by Interplast in Riyadh and Dubai. Building and Insulation Materials made by TSSC in Riyadh and Dubai. Refrigerated Stores, Vehicles, and Displays made by TSSC in Riyadh and Dubai. Pre-manufactured Housing, Shelters, Prefabs and Steel Containers made by TSSC in Riyadh and Dubai. Household, Disposable and Outdoor Products made by Cosmoplast in Riyadh and Dubai. Institutional Furniture by Intermetal in Dubai. Packaging Materials and Plastic Containers for the F&B Industries made by Riyadh Plastic Factory and Cosmoplast in Riyadh and Dubai.
Harwal’s strategy and business model are built around the principles of innovation, quality, and sustainability. As an organization, The Group takes pride in its work, the success of its customers and the results they achieve together in the co-creation of value. Its continued growth and success over the last four decades can be attributed to an ability to adapt and evolve, enabling it to become the leader in each of the industrial sectors it is in, within a customer-centric policy. Range of products I. II. III.
Electrical Accessories - Switches and Sockets. Cable Management System - PVC Pipes, Conduits and Fittings. Pipeline Systems – PVC/PE/PPR Pipes and Fittings.
Product Quality Certifications Electrical:
SASO – PVC Pipes, Conduits and Fittings are certified under SASO GSO IEC 61386-21/2013, SASO GSO IEC 61386-1/2014. ISO 9001:2015 – Quality management system for the “Manufacturing of Cable Management Systems and Electrical Accessories”. UL651 Standard for Schedule 40, 80, type EB and A, Rigid PVC Conduit and Fittings.
Mechanical:
ISO9001:2008 Quality Management System. ISO22000:2005 Food Safety Management System. SASO 14, 15 for PVC pipe, SASO-ISO-4427-2007 for PE pipes and SASO-ISO-15874-2013 for PPR pipe.
Management Interplast encomes a high degree of professional management of international standards, backed up by Harwal Group management’s long industrial experience and technology innovation. Interplast maintains healthy relationships with its stakeholders within a sustainable environment and service dominant logic.
2. TRADE LICENSE/ISO CERTIFICATES
ﺍﻟﺘﺎﺭﻳﺦ ﺍﻟﻤﻮﺍﻓﻖ
١٤٣٩/٠١/٠٦ ٢٠١٧/٠٩/٢٦
ﺭﻣﺰ ﺍﻟﺸﻬﺎﺩﺓ ٢٣٤٣٣١٤٤
ﺷﻬﺎﺩﺓ ﺇﺳﻢ ﺍﻟﻤﻨﺸﺄﺓ :
ﻓﺮﻉ ﺷﺮﻛﺔ ﺍﻧﺘﺮ ﺑﻼﺳﺖ ﺍﻟﻤﺤﺪﻭﺩﻩ
ﺍﻟﺮﻳﺎﺽ
ﺍﻟﺴﻌﻮﺩﻳﺔ ٥٠٢٦٨٢٣١٨ ﺭﻗﻢ ﺍﻹﺷﺘﺮﺍﻙ : ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ١٠١٠٢٣٩١٢٦ :
ﻣﺼﺪﺭﻩ :ﺍﻟﺮﻳﺎﺽ
ﺭﻗﻤﺎ ٣٥ ١٣٦ ١٧١
ﻋﺪﺩ ﺍﻟﻤﺸﺘﺮﻛﻴﻦ ﺍﻟﺴﻌﻮﺩﻳﻴﻦ ﻋﺪﺩ ﺍﻟﻤﺸﺘﺮﻛﻴﻦ ﻏﻴﺮ ﺍﻟﺴﻌﻮﺩﻳﻴﻦ ﺍﻟﻤﺠﻤﻮﻉ
ﻛﺘﺎﺑﺔ ﺧﻤﺴﺔ ﻭ ﺛﻼﺛﻮﻥ ﻣﺸﺘﺮﻛﺎ ﻣـﺎﺋﺔ ﻭ ﺳﺘﺔ ﻭ ﺛﻼﺛﻮﻥ ﻣﺸﺘﺮﻛﺎ ﻣـﺎﺋﺔ ﻭ ﻭﺍﺣﺪ ﻭ ﺳﺒﻌﻮﻥ ﻣﺸﺘﺮﻛﺎ
ﺗﺸﻬﺪ ﺍﻟﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ ﺑﺄﻥ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺃﻋﻼﻩ ﻗﺪ ﺃﻭﻓﺖ ﺑﺈﻟﺘﺰﺍﻣﺎﺗﻬﺎ ﺗﺠﺎﻩ ﺍﻟﻤﺆﺳﺴﺔ ﻭﻓﻖ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻤﻘﺪﻣﺔ ﻣﻨﻬﺎ ﺣﺘﻰ ﺗﺎﺭﻳﺦ ﺇﺻﺪﺍﺭ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ،ﻭﺍﻟﺘﻲ ﺗﻢ ﻣﻨﺤﻬﺎ ﻟﺘﻘﺪﻳﻤﻬﺎ ﻷﻳﺔ ﺟﻬﺔ ﺗﻄﻠﺒﻬﺎ ،ﻭﻫﻲ ﺻﺎﻟﺤﺔ ﻟﺠﻤﻴﻊ ﺍﻷﻏﺮﺍﺽ ﺍﻟﺘﻲ ﻧﺺ ﻋﻠﻴﻬﺎ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ ﻓﻲ ﺍﻟﻤﺎﺩﺓ ) (٦/١٩ﻣﻨﻪ. ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﺳﺎﺭﻳﺔ ﺍﻟﻤﻔﻌﻮﻝ ﺣﺘﻰ ١٤٣٩/٠٢/٠٦ﻫـ.
ﻳﻠﺰﻡ ﺍﻟﺘﺤﻘﻖ ﻣﻦ ﺻﺤﺔ ﻭﺻﻼﺣﻴﺔ ﺍﻟﺸﻬﺎﺩﺓ ﻋﺒﺮ ﺯﻳﺎﺭﺓ ﺍﻟﺮﺍﺑﻂ ﺃﺩﻧﺎﻩ ﻓﻲ ﺍﻟﻤﻮﻗﻊ ﺍﻹﻟﻜﺘﺮﻭﻧﻲ ﻟﻠﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ
ﺃﻭ
ﻋﻦ ﻃﺮﻳﻖ ﺍﺳﺘﺨﺪﺍﻡ ﺍﻟﺮﻣﺰ ﺍﻟﻤﻌﺮﻑ ﺍﻟﺘﺎﻟﻲ :
www.gosi.gov.sa/vc
) ﺍﻟﺸﻬﺎﺩﺓ ﻣﻌﺘﻤﺪﺓ ﻣﻦ ﺻﺎﺣﺐ ﺍﻟﺼﻼﺣﻴﺔ ﻭﻻ ﺗﺤﺘﺎﺝ ﺇﻟﻰ ﺗﻮﻗﻴﻊ ﺃﻭ ﺧﺘﻢ (
ﺗﻌﺪ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﻣﻦ ﺍﻟﻮﺛﺎﺋﻖ ﺍﻻﻟﻜﺘﺮﻭﻧﻴﺔ ﺍﻟﺤﻜﻮﻣﻴﺔ ﺍﻟﺮﺳﻤﻴﺔ ،ﻭﻳﺤﻈﺮ ﻗﻄﻌﻴﺎ ﺗﻘﻠﻴﺪﻫﺎ ﺃﻭ ﺇﺩﺧﺎﻝ ﺃﻱ ﺗﻌﺪﻳﻼﺕ ﻋﻠﻴﻬﺎ ﺳﻮﺍﺀ ﺑﺎﻹﺿﺎﻓﺔ ﺃﻭ ﺍﻟﺤﺬﻑ ﺃﻭ ﺍﻟﺘﻐﻴﻴﺮ ﻓﻲ ﺑﻴﺎﻧﺎﺗﻬﺎ ﺃﻭ ﻏﻴﺮ ﺫﻟﻚ ﻣﻦ ﺍﻧﻮﺍﻉ ﺍﻟﺘﻌﺪﻳﻞ ،ﻭﺗﻌﺪ ﺍﻟﺸﻬﺎﺩﺓ ﻻﻏﻴﺔ ﺇﺫﺍ ﺷﺎﺑﻬﺎ ﺷﻲﺀ ﻣﻦ ﺫﻟﻚ ،ﻛﻤﺎ ﺗﻌﺮﺽ ﺻﺎﺣﺒﻬﺎ ﻟﻠﻤﻼﺣﻘﺔ ﺍﻟﻨﻈﺎﻣﻴﺔ ﺃﻣﺎﻡ ﺍﻟﺠﻬﺎﺕ ﺍﻟﻤﺨﺘﺼﺔ ﺑﺎﻹﺿﺎﻓﺔ ﺇﻟﻰ ﻣﺎﻳﻔﺮﺿﻪ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﻣﻦ ﻋﻘﻮﺑﺎﺕ ،ﻭﻻﻳﺠﻮﺯ ﺗﺪﺍﻭﻝ ﺍﻟﺸﻬﺎﺩﺓ ﺇﻻ ﻓﻲ ﺍﻷﻏﺮﺍﺽ ﺍﻟﺘﻲ ﺃﺻﺪﺭﺕ ﻷﺟﻠﻬﺎ ﻭﻓﻘﺎ ﻷﺣﻜﺎﻡ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ،ﻭﺍﻟﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﻏﻴﺮ ﻣﺴﺆﻭﻟﻪ ﻋﻦ ﺃﻱ ﺁﺛﺎﺭ ﺃﺧﺮﻯ ﻣﺘﺮﺗﺒﺔ ﻗﺒﻞ ﺍﻟﻐﻴﺮ ﻋﻦ ﺍﻟﺸﻬﺎﺩﺓ ﻭﻏﻴﺮ ﻣﺴﺆﻭﻟﺔ ﻋﻦ ﺃﻱ ﻋﻤﻠﻴﺔ ﺗﺰﻭﻳﺮ ﺃﻭ ﺗﻌﺪﻳﻞ ﺗﺘﻢ ﻋﻠﻰ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻮﺍﺭﺩﺓ ﻓﻴﻬﺎ .
Certificate of Registration QUALITY MANAGEMENT SYSTEM - ISO 9001:2008 This is to certify that:
Cosmoplast Industrial Co LLC Industrial Area No 1 Sharjah 6032 United Arab Emirates
Holds Certificate No:
FM 75767
and operates a Quality Management System which complies with the requirements of ISO 9001:2008 for the following scope: Development, Manufacture and Sale of Pipeline System Products covering: Polyvinyl Chloride (PVC) Pipes and Fittings Polyethylene (PE) Pipes and Fittings Cross linked Polyethylene (PEX) Pipes and Fittings Poly Propylene (PP) Pipes and Fittings Pre Insulated Pipes and Fittings Glass Reinforced Plastic (GRP) Pipes and Fittings
For and on behalf of BSI: Frank Lee, EMEA Compliance & Risk Director Original Registration Date: 04/06/2003
Effective Date: 26/05/2015
Latest Revision Date: 20/05/2015
Expiry Date: 26/05/2018 Page: 1 of 2
This certificate was issued electronically and remains the property of BSI and is bound by the conditions of contract. An electronic certificate can be authenticated online. Printed copies can be validated at www.bsi-global.com/ClientDirectory or telephone +971 (4) 3364917. Information and : BSI, Kitemark Court, Davy Avenue, Knowlhill, Milton Keynes MK5 8PP. Tel: + 44 845 080 9000 BSI Assurance UK Limited, ed in England under number 7805321 at 389 Chiswick High Road, London W4 4AL, UK.
Certificate No:
FM 75767
Location
ed Activities
Cosmoplast Industrial Co LLC Industrial Area No 1 Sharjah 6032 United Arab Emirates
Development, Manufacture and Sale of Pipeline System Products covering: Polyvinyl Chloride (PVC) Pipes and Fittings Polyethylene (PE) Pipes and Fittings
Cosmoplast Industrial Co LLC Branch of Abu Dhabi 1 ICAD Abu Dhabi United Arab Emirates
Development, Manufacture and Sale of Pipeline System Products covering: Polyvinyl Chloride (PVC) Pipes and Fittings Polyethylene (PE) Pipes and Fittings Cross linked Polyethylene (PEX) Pipes and Fittings Poly Propylene (PP) Pipes and Fittings Pre Insulated Pipes and Fittings Glass Reinforced Plastic (GRP) Pipes and Fittings
Original Registration Date: 04/06/2003
Effective Date: 26/05/2015
Latest Revision Date: 20/05/2015
Expiry Date: 26/05/2018 Page: 2 of 2
This certificate was issued electronically and remains the property of BSI and is bound by the conditions of contract. An electronic certificate can be authenticated online. Printed copies can be validated at www.bsi-global.com/ClientDirectory or telephone +971 (4) 3364917. Information and : BSI, Kitemark Court, Davy Avenue, Knowlhill, Milton Keynes MK5 8PP. Tel: + 44 845 080 9000 BSI Assurance UK Limited, ed in England under number 7805321 at 389 Chiswick High Road, London W4 4AL, UK.
3. ORGANIZATIONAL CHART
PRO / HR DEPT. S STORES/
HELPER / PACKERS
OPERATORS / SETTERS
PRODUCTION SUPERVISOR
PRODUCTION MANAGER
PURCHASING
S & .MANAGER
MECHANIC
QA/QC IN-CHARGE
Rev. Date: 13/07/2017
Issue: 01, Rev: 0
FLOW Chart – F1
ORGANIZATION CHART
SALES DEPT.
SALES IN-CHARGE
ELECTRICIAN
MAINTANANCE SUPERVISOR
PLANT MANAGER
EXECUTIVE DIRECTOR
HARWAL LTD.
4. LIST OF PROJECTS
Presidential Guards Command
Construction Works of istrative Buildings and Office Buildings in Mahwi Camp
Prince Mohammed Bin fahad Bin Abdulaziz Al Saud
Al maather compound
Recreating center
General organization for social insurance
ADSSC
O-12099, Upgrade of 7/13 and 7/2 Pumping Stations Capacity and Construction of Two Pumping Stations for the Development Area at Khalifa A and the Industrial Area ICAD III - Abu Dhabi Mainland
Al Rimal Gated Community
Abu Dhabi Educational Council
Abu Dhabi Future School Program Girls School at Al Falah
HRT/SS-001, Supply, Installation, Testing & Commisioning of Canal Bridge 132/11kV Substation, Sheikh Zayed Road, Dubai
END
PROJECT
Dhalilyam Engineering consultants
Dar Al Riyadh
Dorsch Gruppe
Relays Engineering Consultants
Al Torath Consulting Engineers
CONSULTANT
Othaman Al Ghamdi contracting est
Saudi constructioneers.
Abu Dhabi Maintenance and Construction Co. LLC (AC)
Dhabi Contracting LLC
Al Habtoor Leighton Group
Al Ain General Contracting Company (ALGECO)
CONTRACTOR
280-900
Pipeline Works
Swimming Pool
160mm/9.5m m thk. & Cable Route Profile 110mm/6.6 thk.
External Water Supply
PIPE OD APPLICATION
PE 100
PE 100
PE MATERIAL USED APPROX PIPE LENGTH
Cosmoplast Track Record of Projects where PE Pipes & Fittings are Successfully Installed
SDR 11
SDR 11
DESIGN PRESSURE (BAR)
2016
2015
2014
2014
2014
2014
YEAR
Nakheel
HH Sheikh Sultan Bin Zayed Al Nahyan
Dubai Electricity & Water Authority DEWA
ADSSC
Abu Dhabi Transmission & Despatch Company (TRANSCO)
Jumeirah Park and Al Furjan
AA 211 ( Construction of Private Villa )
Construction of Lussaily Reservoir Phases 1 & 2 (120MIG)
Construction of Roads & Infrastructure at Sector SE45 - Khalifa City A
Water Supply System for Fujairah Distribution Network Lot - B & C
Mussafah Water Transmission Scheme MWTS Mussafah to Abu Dhabi - Lot M
Obaid Mehayer Bin Suroor Al Hameeri
Commercial/Residential (B+G+2+R) Building on Plot No. 362-0298 @ Umm Suqeim 2nd, Dubai
Khatib & Alami
OTAK International
-
Keo International
Group Consultant International
Aydiner Conctructions
Lindenberg Water & Drainage
Bin Hafeez General Contracting Est.
-
Onyx General Contracting Co. LLC
Al Marwan General Contracting Co. LLC
General Construction Company - Main Contractor / Radiant Technical Works Sub-Contractor
355mm
Water Works
Road Crossing of Power Cables & Instrumentation Cables
Sewerage & Irrigation
Fire Fighting Works
710mm1000mm
Cosmoplast Track Record of Projects where PE Pipes & Fittings are Successfully Installed
PN16
SDR 11
2014
2014
2014
2014
2014
2014
2014
Bel-Yoahah
Al Wasl Asset Management Group
FEWA
R456, Muhaisanah Residential Development
FEWA Contractor no.E21/2012-132 KV & 33 KV Cabling Works in Northern Emirates ETA Star International LLC
Al Arif Contracting Co. LLC
Sub Contractor
Dutco Balfour Beatty LLC / Flora Boring -
Al Naboodah Contracting
CMW Armed Force
Construction and Ministry of Maintenance of 134 No's Housing Strategic Town Houses at Al Madina Projects Al Shamaliya
Construction of Infrastructure Works at Sweihan Airport
MML
Core Engineering Consultancy L.L.C
Projects Construction Company W.L.L.
Core Engineering / KIER Construction L.L.C
Utility Plant & Distribution Leighton Contracting (UP & D) and East Midfield Abu Dhabi Abu Dhabi LLC / Al Kellog, Brown and & Perimeter Roads Airport Company Nasr Contracting Root Services Construction of Potable and (ADAC) Company LLC - Sub Fire Water Networks Contractor
Energoprojekt Entel
Parsons
MERAAS
City Walk Development Infrastructure
Parsons Overseas Limited
EMAAR Properties PJSC
Arabian Ranches II Development Shallow Services & Internal Roads Phase - 2 ( Package 4)
25mm
40mm700mm
110mm160mm
180mm315mm
Irrigation
Water Supply
Cabling Works
Water Supply Works
Fire Fighting Works
Fire Water
PE 100
PE 100
PE 100
PE 100
PE 100
Straight 12/Coil 100 M
Cosmoplast Track Record of Projects where PE Pipes & Fittings are Successfully Installed
SDR 11
16 Bar
PN16
SDR 11 , PN16
SDR 11 , PN16
2013
2013
2014
2014
2014
2014
2014
CAP
ADDC
Zoo & Aquarium Public Institution in Al Ain Wildlife Park & Resort
Al Hila Properties
aabar
ADDC
ADCD/ADDC
Sheikh Zayed Desert Learning Center & U.A.E World Desert
Internal Roads+Sleeves & Ducts for Future Services
Saraya R01, R02 Residential Developments on Plot C21, C22, Sector E 12 Abu Dhabi
Consultancy Services for Improvement and Extension of Water Network in the Central Region of Abu Dhabi Emirates.
Al Silaa Community Hospital
ED Zublin AG/Cost Middle East
Hill International
TEBODIN Consultant & Engineerins
Architecture & Planning Group/Blain Anderson
Al Sabbah Electromechanical
Delma Engineering Projects
Arabtec
Irrigation
110mm, External Water Al Nasr Contracting 180mm, Supply and Fire Co. L.L.C 225mmm315 Fighting Network mm, 400mm
Code Contracting L.L.C
Consulting General Construction Engineering Office Company
AECOM Middle East L.L.C
Replacement of DN 600 Pipeline from Shawamekh R/A up to Zayed Military City
Mott Macc Donald
ADDC
Water Works Including Kahona Pipeline & Construction Renovation of Washouts
Cosmoplast Track Record of Projects where PE Pipes & Fittings are Successfully Installed
SDR 11, PN 16
SDR 11, PN 16
SDR11 and SDR 17
2013
2013
2013
2013
2013
2013
2013
PRFD
ADDC
ADDC
ADDC
Utico
Cont. C 956 - Main Irrigation Line from Mafraq -
Water Supply to H.H. Sheikh Khalifa Palace Qasawira
Najmat AbuDhabi - Al Reem Island
Cont No. D9811Water Supply To New Plots, Al Radeem Area, Abu Dhabi
IWP Project
Utico
Italconsult
HyderCosnulting ME
AECOM
PARSONS
PARSONS
PRFD
Cont. No. 991 , Landscape PFRD Works Musaffah Ind Area
AECOM Middle East L.L.C
Architectural & Engineering Consultants
Abu Dhabi City Municipality
Al Rawafed Private School
Department of Municipal Affairs Abu Dhabi City Municipality Parks and Recreation Facilities Division
Utico
Delma Engineering Projects Co.
N.P.C
Al Nasr Contracting
Al Ryum Cont.
Al Jurf Dev. Partners
Seapal Contracting Est.
Watersupply
Water Supply
1200mm, 1000mm, 630mm
Water Supply
Water Supply
Irrigation Works
Irrigation Works
110 – 355mm
32mm 630mm
355mm
450 mm 800 mm
160 mm 400 mm
90mm, 110mm, 160mm, Al Jaber Transport & 180mm, Gen . Cont. L.L.C 225mm, 250mm, and 280mm
PE 100
PE100
PE 100
PE 100
PE 100
PE 100
3 km
10 KM
18 km
43 km
27 km
47 km
Cosmoplast Track Record of Projects where PE Pipes & Fittings are Successfully Installed
SDR 17
SDR17
SDR 17
SDR 11
SDR 13.6
SDR 11
SDR 11, PN 16
2009
2009
2010
2011
2011
2011
2013
2013
TDIC
Reem Developers
TRANSCO
ADDC
Al Alin Distribution
END
ADSSC
TDIC
Bunya For Projects LLC
ALDAR BUNYA SEWA
Saadiyat Island Construction Village
Reem Island Development
LN 3850 -Water supply to VIP farms in Northern Areas
Cont. No. D-8600 Water Dist. Network
3938.1- Reinforcement of 33/11 KV substation in AlAin Area
PROJECT
Cont No. 0-1100Sewage Force Mains, Madinat Zayed, Gayathi
Project P025 Potable Water Supply. Qasar Al Sarab – Resort, Abu Dhabi.
Al Reem Island, Regional Roads & Utilities – Infra Package 1
Yas Island Logistics, Package1
Al Reem Island Development
Al Sajaa
SEWA
Parsons International
Halcrow International
Parsons International
Cansult Maunsell AECOM
Cansult Maunsell AECOM
CONSULTANT
PB Power
Italconsult
Lootha BC
Orascom
Taisei Corporation / Al Nasr Contg.
Orascom-Contrack JV / Al Fanar Gen. Cont.
Code Contg. Co.
Code Contg. Co.
CONTRACTOR
Larsen & Toubro
Ghantoot Transport & Gen. Contruction
Tecton Engineering
Orascom / Al Fanar
Parsons International
Tebodin M. E
Gulf Leighton / Hyper Gen Contracting
Pasrsons International
315mm
400mm800mm
110mm – 550mm
32mm – 400mm
315mm
355 – 400mm
PIPE OD
200mm
110 mm 315mm
110mm 315mm
250 mm 400 mm
63mm 315mm
Gas
District Cooling
Water Works
Gas Network
Watersupply
Sewerage
APPLICATION
Duct
Water Supply
Water Supply
Gas Network
Fire Figthing
PE 80
PE100
PE100
PE100
PE100
PE100
PE MATERIAL USED
PE 100
PE 100
PE 100
PE100
PE100
24km
5 km
15 KM
12 KM
10 KM
18 KM
APPROX PIPE LENGTH
10 km
6 km
6 km
Cosmoplast Track Record of Projects where PE Pipes & Fittings are Successfully Installed
SDR 11 Bar)
SDR 17
SDR11
SDR11
SDR11
SDR11
(16
DESIGN PRESSURE (BAR)
SDR 17
SDR 17
SDR 11
SDR 11
SDR 11
2008
2008
2008
2008
2008
2008
YEAR
2009
2009
2009
2009
2009
TATWEER ADSSC TDIC Ameco Nakheel
Transco - Adh
AL DAR
Tiger Woods Golf Course Dubai
Sewerage Free Main from Madinat Zayed & Ghayati
P025 Qasr Al Sarab Hamim Resort
Sharjah Investment Centre
Internationl City - Phase 2
Water Supply to Sheikh Hamdan bin Al Maktoum Farm at Dhaid
Yas Island Development Project
END
ADDC SEWA
RAK Gas Comm. SCADIA
PROJECT
Contract No. N-4357 Sas Al Nakheel
Rahamania
RAK Water Distribution Network
New 2KRunway Abu Dhabi International Airport
Contract No. D-4860 Ruwais ADWEA / DMW
Borouge
Borouge 2 Polyolefins Project Ruwais
Gas Distribution
32mm 400mm
RAK Gas Comm. Oderbrecht Al Jabber JV
Halcrow International Partnership
Lootha BC
SEWA / Katib & Alami Halcrow
63mm 280mm
Exsym Coropration/ Al Barrak Electrical Contracting
P.B. Power
75mm250mm
225mm500mm
250mm
PIPE OD
355mm
50mm 355mm
Potable Water& Irrigation services
Water Line
Gas
Electrical Duct
APPLICATION
Potable Water
Potable Water , Irrigation
Potable Water Dist Network
Potable Water
125mm500mm
630 mm
Potable Water
Portable water mains
Potable Water
Drainage
355mm
315mm 400mm
500mm
110mm 400mm
CONTRACTOR
Code Contracting
M.H. Ali El Saie Consulting Engineering CONSULTANT
Al Nasr Contracting
Tecton Engineeing & Construction
Lootah BC
Darwish Engineering
Code Contracting
Code Contracting
Al Nasr contracting
Granite Construction Co.
Halcrow International
Tebodin
Bovis Lend Lease
Cansult Maunsell
Cansult Maunsell
Cansult Maunsell
Katib & Alami
Techmont
PE-100
PE 100
PE 80
PE 100
7km
35km
8.5km
8km
8 Bar
16bar
SDR 11 Bar)
16 Bar (16
DESIGN PRESSURE (BAR)
APPROX PIPE LENGTH
(16
PE MATERIAL USED
16 Bar
SDR 11 Bar)
SDR 11
16 Bar
8km
7 km
8 km
16 Bar
16 Bar
16 Bar
10 Bar
SDR 17
8km
PE
10 km
8 km
18 km
14km
5 km
PE 100
PE 100
PE 100
PE 100 & 80
PE 100
PE 100
PE 100
PE 100
PE 100
Cosmoplast Track Record of Projects where PE Pipes & Fittings are Successfully Installed
2007
2007
2008
2008
YEAR
2008
2008
2008
2008
2008
2008
2008
2008
2008
Parsons De Leuw Cather Parsons De Leuw Cather
Dubai Health Care City PhSama Dubai LLC 2
ALDAR Nakheel
ADWEA/ AADC
Iraq Govt
Hanoo Group Iraq Govt END
Nakheel
Al Raha gardens
Jumeirah Village Circle Gas Line
Dev. of Al Ain Water Dist.System
Construction of Phase IV of the Barrah Sewer Proj. Al Maquil area
Sharjah Industrial City
Sewer Pumping Main
PROJECT
Gas Distribution Network on Palm Jumeirah
ACER-Freeman
CONSULTANT
A
Khatib & Alami
Iraq Govt
Maunsell
Mouchel Parkman
GHD consult 32mm400mm
90mm500mm 32mm110mm
Lootah BC
CONTRACTOR
Flour Amec
Darwish Engr
Flour Amec
25,
125mm
PIPE OD
Gas Distribution
APPLICATION
PE 80 -Yellow
PE MATERIAL USED
PE-100
Sewerage Pumping Mains 900mm
PE-100
Potable Water Dist Network
32mm 710mm
PE 100
PE 80
Hydrant sewer line
Potable Water Distribution
30km
APPROX PIPE LENGTH
7.9km
25km
6.8km
4km
8km
9km
1.5km
1.6km
5km
6.3km
PE-80 PE-100 25km
PE-100
LNG Distribution System LNG Distribution System
PE 100
PE 100
PE-100
PE 100
PE 100
PE 100
Potable Water
LNG Distribution System
Sewerage
Sea water intake for Desalination Plant
Fire Hydrant Main
Potable Water
900mm
Code Contracting Co. 20mm-63mm
Lootah BC gas
Al Jaber Est
Darwish Engineering
Halcrow
315mm
200mm
Arabian Environmental Construction - Jordan Lootah BC gas
1200mm
180mm450mm
110mm 450mm
China Habour
Wade Adams
Wade Adams
Pan African energy
Amman Municipality
Municipality of Greater Amman
Ghabawi Landfill
Dar Al Salam Gas ProjectPan African Tanzania Energy Mina al Arab Infrastructure RAK Properties Dev
Halcrow
Sharjah Municipality
Khorfakkan Sea Water Intake
The Lagoons
Sama Dubai LLC
Cosmoplast Track Record of Projects where PE Pipes & Fittings are Successfully Installed
4 Bar
DESIGN PRESSURE (BAR)
4 Bar
6 Bar
6 Bar
8 Bar
4 Bar
4 Bar
16 Bar
7 Bar
16 Bar
SDR 26
16bar
16bar
2004
YEAR
2005
2005
2005
2005
2006
2006
2006
2006
2007
2007
2007
2007
Emaar
Dubai Marina southern break waters Halcrow
Tebodin
Abu Dhabi Municipality
Lining of steel pipe for high Qatar petroleum pressure water injection
Rehabilitation of Steel Gas Mines with HDPE Liner pipes
ADWEA
ADWEA
Qatar Petroleum
Hyder Consultants
Stone & water
D-01-
ADWEA
HDPE 630mm mains from Sweihan to Defence R/A
Tebodin
Contract: Swehaa 0157
ADWEA
Rehabilitation of Water Wells
Private Dept
Stone & Webster
Shk .Zayed Pvt dept
Desalination Plant at Ghantoot
Bectel
D-01-
Iraq Govt
Sewerage Pumping Main for Infrastructure Reconst. Project
Khatib & Alami
Contract : Liwa 0133
SEWA
Al Mouf Real Estate Dev. Sharjah
Tebodin
Dalla Consultant
ADWEA
Installation of Water Line Umm Ghafaa Area Al Ain
Pan African Energy
Gas Distribution Network in Qatar petroleum the Industrial Area Doha
Pan African Energy
Gas Distribution Network in Dar Es Salam Ind. Area
APS
APS
GCC
GCC
Atilla Dogan
Overseas AST
Al Nasr irrigation
Astraco
Toledo construction
Van Leeuwen
Wade Adams
Al Nasr irrigation
Tarasen
125mm
400mm
456mm
Water Irrigation
Irrigation Mains
Portable Water Mains
225mm, 160mm, 110mm
PE 100
PE 100
PE 100
PE 100
PE 100
Gas Distribution network in industrial area Portable water mains
PE 100
PE 100
Submarine Ducting
Water
225mm
75, 90, 110mm
500mm
630mm
Transportation of well water reservoir
450mm, 315mm, 180mm
PE 100
PE 100
Sea Water Intake for Desalination Plant
1000mm
PE 100
PE 100
PE-100 orange
PE-100
Water
Water
Gas Distribution
Sewerage
1200mm
225mm, 280mm
400mm, 315mm
25,
4km
17km
18km
13km
27km
1km
2km
27km
1km
4.6km
15km
10km
18km
Cosmoplast Track Record of Projects where PE Pipes & Fittings are Successfully Installed
For 50bar Steel Pipe
6 Bar
7 Bar
7 Bar
4 Bar
10 Bar
8 Bar
3 Bar
3 Bar
6 Bar
6 Bar
7 Bar
2002
2002
2002
2002
2002
2002
2003
2003
2003
2004
2004
2004
2004
SCECO
Tabreed
Saudi Consolidated Electric Co.
KWT Municipality Aramco Aramco
ZMC district cooling system 1, 293 Gas & Water Supply
Elect. Cable Laying Contract No. 82335/00
Waterfront Project Kuwait City
HDPE Liner Pipes
ABQAIQ facilities Abdu Dhabi
Tebodin
Brown & Root
W. E.D
Saudi Petro Chmeical Co.
Submarine Pipeline
Sadaf Expansion Project
QGPC
QGPC
QGPC Contract CC 186/95
Watson Hawksley
Dubai Municipality
Halcrow
Aramco
Aramco
KEO Kuwait
PLE Int’l
Dubai Sewerage Job No.DS 83/3/3 Dubai
Amiri Flight Facilities Abu Adbu Dhabi Govt. Dhabi
Tebodin
SEWA
Sharjah Gas Distribution Network Phase 2
Mott McDonald
FUJ ports authority
Fire ring mains at Fujairah port
CONSULTANT
END
PROJECT
Gas distribution – Sharjah City
Fire Ring Mains
APPLICATION
250 , 355 & Gas / Water Mains 400 mm
20, 125 mm
315, 225mm
PIPE OD
Aject / Siemens KSA
Six Construction
Al Khorayef Est.
Lilley Intl.
Al Wimpey
Aject
Aject
160mm
225mm
211mm
250mm
225mm
160mm
400mm
PE 80
PE 80
Cable Ducting Ducting by directional Drilling to upgrade 230KVA power cable
PE 80
PE 80
Pipe Bursting of existing sewer relining with Cosmolok Pipe Pipe Liner
PE 80
PE 100
PE 80
PE 80
PE 80
PE 100
PE 80
PE 100
PE MATERIAL USED
Installtion of Fire Hydrant Mains
Sewer Pumping Station
Installation of HDPE Duct by directional drilling method Sewer Pipeline Fawaz Electro Mech. 32 , 160mm systems Internal Liner for Al Khorayef Est. 312, 302mm Steel Pipes
Al Nasr Irrigation
SS Lootah BC Gas Int'l (JV)
Six Construction
CONTRACTOR
0.5 km
2 km
3km
2.5 km
2 km
0.5 km
72 km
3 km
2 km
40 km
600 km
4km
APPROX PIPE LENGTH
Cosmoplast Track Record of Projects where PE Pipes & Fittings are Successfully Installed
Non Pressure Allpication
For 50bar Steel Pipe Non Pressure Application
Non Pressure Application
7Bar
1999
1999
1999
1999
1999
1999
1999
For 50bar Steel Pipe 6 Bar
2000
2000
2001
2001
2002
YEAR
4 Bar
Non Pressure Application
10 bar
4 Bar
8 Bar
DESIGN PRESSURE (BAR)
W.E.D
END
W.E.D
UNICEF
Armed Forces
Abu Dhabi Municipality
Al Farat PCC Syria
Liwa Hotel
JAFZ - Dubai ADCO
PROJECT
Potable Water Distribution Project at Marfa Phase 4
Sanitation Facilities in Third World Countries
Optic Fibre Cable Laying for Defence Project
Sewerage Line at Baniyas Club Abu Dhabi
HDPE Internal Pipe Liner for High Pressure Carbon Steel Pipe
Potable Mains for Liwa Hotel
FireHydrant Mains at JAFZ
Potable Mains at ADCO Lab Facilities
Stone & Webster
Tebodin
Al Baraj Consultants
Petrofac USA
Dorsch Consultants
Lucent Technology
UNICEF
D. Balfour & sons
CONSULTANT
W.E.D
W.E.D
W.E.D
Taweelah Power Project Abu Dhabi
Halcrow
KEO
Sheikh Sultan Pvt Dept
Sharjah Municipality
SPC- Abu Dhabi Munciaplity
Road Crossing at various locations using directional drilling
Sewer Pumping Mains at Sharjah Potable Water Mains to Al Ariam Island
Sheikh Sultan Pvt Dept
Potable Water Mains to Qasar Bu Shajar & Saied Islands
Commodore Const. Co.
Al Khorayef Est.
Collavino Golf
NSC Flowtext
UNICEF
AC
CONTRACTOR
A.B.B. Sae Sadelmi
Suwaidco
Darwish Engeering
Silver Coast Construction
Toledo construction
280 mm
315mm
180,125,90,6 3, 50mm
312 , 302mm
90 mm
110mm , 160mm
20 , 110 mm
20, 180 mm
PIPE OD
20, 63mm
355 mm
315mm
400, 355, 255, 180mm
Water Mains
Fire Hydrant Main
Potable Water Mains
PE 100
PE 100
PE 80
PE 80
PE 100
Installation of HDPE Sewerage Line using E /F Internal Liner for Pipes
PE 100
Duct
PE 80
Potable water Distriubtion in various countries
10 km
22km
2 km
64 km
0.4 km
30 km
83.5 km
12 km
12 Bar
10 Bar
8 Bar
For 70 Bar Steel Pipe
6 Bar
Non Pressure Application
6 Bar
7 Bar
DESIGN PRESSURE (BAR)
APPROX PIPE LENGTH PE MATERIAL USED PE 80
8 Bar
10 Bar
6 Bar
10 / 6 Bar
10 Bar
1.5 km
3 km
1.5 km
6 km
12 km
PE 80
PE 100
PE 100
PE 100
PE 100
Potable Water Distribution
APPLICATION
Installtion of Fire Hydrant Mains
Sewer Pumping Mains Potable Water Mains ( under sea)
Sewer/ Irrigation Pumping Mains
90, 110, 125 Potable Water mm Mains ( under sea)
Cosmoplast Track Record of Projects where PE Pipes & Fittings are Successfully Installed
1997
1997
1998
1998
1998
1998
1998
1998
YEAR
1998
1998
1998
1998
1998
Dubai Municipality ADCO
Kuwait Oil Co.
Dubai Sewerage Job No. Dubai
Potable Mains at ADCO Lab Facilities
Calm Bouys Project Kuwait Consultants
Stone & Webster
ACER-Freeman
Bredero Price
Al Nasr irrigation
Dutco Balfour
630 mm
400 mm , 355mm
250, 315, 355 mm
Insulation Jacket for Steel Pipes
Water Mains
Pipe Bursting of existing sewer relining with Cosmolok Pipe
PE 80
PE 100
PE 80
6 km
12 km
2 km
Cosmoplast Track Record of Projects where PE Pipes & Fittings are Successfully Installed
Non Pressure Application
12 Bar
Non Pressure Application
1996
1996
1997
5. PRODUCT CATALOGUES
APPROVED
20
2-2.5%
APPROVED
APPROVED
“
BSEN12201
APPROVED
, FM, SKZ, SASO
Kitemark Licence ™
No. KM 546726 This is to certify that:
Certificate of Registration This is to certify that:
Kitemark Licence ™
Cosmoplast Industrial Co LLC Industrial Area No 1 Sharjah 6032 United Arab Emirates
Holds Kitemark Licence Number:
No. KM 546725 This is to certify that:
Holds Certificate No:
Cosmoplast Industrial Co LLC Branch of Abu Dhabi 1 ICAD Abu Dhabi United Arab Emirates
QUALITY MANAGEMENT SYSTEM - ISO 9001:2008
Cosmoplast Industrial Co LLC Branch of Abu Dhabi 1 ICAD Abu Dhabi United Arab Emirates
FM 75767
BS ISO 4437-2:2014 Plastics piping systems for the supply of gaseous fuels. Polyethylene (PE) Pipes. This issues the right and Licence to use the Kitemark in accordance with the Kitemark and Conditions governing the use of the Kitemark, as may be updated from time to time by BSI Assurance UK Ltd (the "Conditions"). All defined in this Licence shall have the same meaning as in the Conditions. The use of the Kitemark is authorized in respect of the Product(s) detailed on this Licence provided at or from the above address.
and operates a Quality Management System which complies with the requirements of ISO 9001:2008 for the following scope: Holds Kitemark Licence Number:
Development, Manufacture and Sale of Pipeline System Products covering: Polyvinyl Chloride (PVC) Pipes and Fittings Polyethylene (PE) Pipes and Fittings Cross linked Polyethylene (PEX) Pipes and Fittings Poly Propylene (PP) Pipes and Fittings Pre Insulated Pipes and Fittings Glass Reinforced Plastic (GRP) Pipes and Fittings
KM 546726
In respect of:
KM 546725
Certificate of Compliance
In respect of:
ISO 4427-2 Polyethylene (PE) pipes for water supply
This certificate is issued for the following: Polyethylene Pipe (see details on following page)
This issues the right and Licence to use the Kitemark in accordance with the Kitemark and Conditions governing the use of the Kitemark, as may be updated from time to time by BSI Assurance UK Ltd (the For and on behalf of BSI: "Conditions"). All defined in this Licence shall have the same meaning as in the Conditions.
Gary Fenton, Global Assurance Director
The use of the Kitemark is authorized in respect of the Product(s) detailed on this Licence provided at or from the above address. First Issued: 3/10/2014
Latest Issue: 3/10/2014
Manufactured at:
Prepared for:
Cosmoplast Industrial Co., LLC Branch of Abu Dhabi 1 P.O. Box 8593 Abu Dhabi, UAE
Cosmoplast Industrial Co., LLC P.O. Box 6032 Sharjah, UAE
For and on behalf of BSI: Frank Lee, EMEA Compliance & Risk Director Original Registration Date: 04/06/2003
Effective Date: 26/05/2015
Latest Revision Date: 20/05/2015
Expiry Date: 26/05/2018
First Issued: 3/10/2014
Latest Issue:
3/10/2014
1
of
FM Approvals Class: 1613
2
Approval Identification: 0003055480 Page
Page: 1 of 2 For and on behalf of BSI:
First Issued: 19/08/2014
First Issued: 19/08/2014
1
of
Latest Issue:
19/08/2014
This Licence remains the property of The British Standards Institution and shall be returned immediately upon request. To check its validity telephone +44 (0)845 080 9000
Information and : BSI, Kitemark Court, Davy Avenue, Knowlhill, Milton Keynes MK5 8PP. Tel: +44 845 080 9000. BSI Assurance UK Limited, ed in England under number 7805321, at 389 Chiswick High Road, London, W4 4AL, UK. A member of the BSI Group of Companies.
Page
1
of
Said Approval is subject to satisfactory field performance, continuing Surveillance Audits, and strict conformity to the constructions as shown in the Approval Guide, an online resource of FM Approvals.
3
BSI Assurance UK Limited, ed in England under number 7805321 at 389 Chiswick High Road, London W4 4AL, UK.
Page
1
of
3
David B. Fuller AVP, Manager – Fire Protection FM Approvals 1151 Boston-Providence Turnpike
Norwood, MA 02062
This Licence remains the property of The British Standards Institution and shall be returned immediately upon request. To check its validity telephone +44 (0)845 080 9000
Information and : BSI, Kitemark Court, Davy Avenue, Knowlhill, Milton Keynes MK5 8PP. Tel: +44 845 080 9000. BSI Assurance UK Limited, ed in England under number 7805321, at 389 Chiswick High Road, London, W4 4AL, UK. A member of the BSI Group of Companies.
Page 1 of 2
APPROVED
Approval Granted: July 20, 2015
2
To the availability of the Approved product, please refer to www.approvalguide.com
Gary Fenton, Global Assurance Director
Latest Issue: 19/08/2014
This certificate was issued electronically and remains the property of BSI and is bound by the conditions of contract. An electronic certificate can be authenticated online. Printed copies can be validated at www.bsi-global.com/ClientDirectory or telephone +971 (4) 3364917. Information and : BSI, Kitemark Court, Davy Avenue, Knowlhill, Milton Keynes MK5 8PP. Tel: + 44 845 080 9000
Page
5
25
APPROVED
630
APPROVED
SABfuse & Plastitalia of Italy
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
APPROVED
ate Certific
GEMENT Y MANA QUALIT to certify This is
n istratio of Reg SYSTEM
that:
01:2008 - ISO 90
Co LLC ustrial plast Ind No 1 Cosmo a rial Are Indust Sharjah es 6032 b Emirat Ara United
for the 1:2008 ISO 900 nts of 767 uireme FM 75 h the req plies wit ich com No: tem wh tificate ent Sys Holds Cer g: nagem erin Ma cov Quality ducts rates a tem Pro and ope scope: eline Sys ng e of Pip followi and Sal acture Fittings , Manuf C) Pipes and pment Develo Chloride (PV and Fittings and Fittings yl Pipes ) Pipes Polyvin ne (PE hylene (PEX) ings hyle yet Fitt yet Pol ed Pol es and ings Cross link ne (PP) Pip Fittings pyle and Fitt Poly Pro ted Pipes and (GRP) Pipes ula Pre Ins nforced Plastic Glass Rei
ctor Risk Dire nce & 2015 Complia 26/05/ , EMEA e Date: Frank Lee 2018 Effectiv 26/05/ Date: Expiry 1 of 2 Page:
: alf of BSI on beh For and
3 06/200 e: 04/ ation Dat 2015 Registr 20/05/ Original n Date: Revisio Latest
ract. s of cont condition d by the is boun BSI and 3364917. erty of +971 (4) the prop 080 9000 remains telephone 44 845 Tel: + ctory or ically and online. lientDire electron MK5 8PP. ated 4AL, UK. issued be authentic global.com/C Keynes on W4 e was Milton .bsiLond can ficat , e lhill, at www This certi ic certificat High Road ue, Know validated tron Chiswick Davy Aven can be An elec at 389 Court, copies 7805321 Printed Kitemark r number act: BSI, and unde and Cont Engl tion in d tere Informa ted, regis e UK Limi ranc BSI Assu
™ ence rk Lic Kitema No. KM
ial Co Industr
LLC
Cosmop
las
Holds Kite mark Lice nce In respec
: Number
Latest
Issue:
For and on beh alf of BSI :
19/
1 of Page
Latest
Issue:
2014
19/08/
2014
19/08/ ued: First Iss
est. upon requ ediately . ned imm 080 9000 be retur +44 845 4AL, UK. and shall tution 8PP. Tel: on, W4 s Insti es MK5 Road, Lond Standard n Keyn High British lhill, Milto Chiswick of The 9000 ue, Know 321, at 389 property (0)845 080 ins the +44 Davy Aven ber 7805 ce rema telephone Court, r num This Licenits validity Kitemark England unde k BSI, in chec To : ed es. ed, on and pani Informati rance UK LimitGroup of Com BSI Assu of the BSI ber A mem
e
omplianc
ng: followi for the is issued e e) ylene Pip Polyeth following pag on details
ificate
(see
at: actured Manuf , LLC strial Co. last Indu Dhabi 1 Cosmop of Abu Branch Box 8593 P.O. E bi, UA Abu Dha
ed for:
Prepar
, LLC strial Co. last Indu 2 Cosmop P.O. Box 603 , UAE Sharjah
s: 1613
rovals Clas
FM App
5480
20, : July
l Granted
Approva
2015
de.com rovalgui www.app ity to the t conform and stric ls. Audits, Approva eillance of FM ng Surv lability , continui online resource fy the avai ormance e, an To veri field perf roval Guid factory App to satis shown in the subject as is s l tion rova construc Said App
ation: l Identific
Approva
000305
d product,
rove of the App
please
refer to
on er B. Full – Fire Protecti David ager e AVP, Man rovals ce Turnpik FM App ton-Providen 62 1151 Bos
d, Norwoo
MA 020
of 2 Page 1
APPROVED
Gary Fen ton, Glo bal Ass urance Directo r
Latest
2014
ate of C
First Issu ed: 3/1 0/2014
4 08/201
08/ ued: 19/ First Iss
KM 54 6726
s issues supply the righ of gaseo govern t and ing the us fue Licence ls. Polye use of to use "Condi the Kite the Kite tions"). thylen mark, All define mark in e (PE) as ma accord d term Pipes. y be upd The use ance with s in this ated from of the Licence the Kite Kitema shall hav above time to mark Ter rk is aut addres e the sam time by ms and horized s. e meani Conditi BSI Ass in respec ng as in ons urance t of the the Con UK Ltd Produc ditions t(s) det (the . ailed on this Lice nce pro vided at or from the
Director urance bal Ass ton, Glo Gary Fen : alf of BSI on beh For and
Number :
BS ISO t of: Plastics 4437-2:2014 piping system s for the Thi
6725 KM 54
ons Conditi Holds ms and (the rk Ter UK Ltd Kitema urance h the pply BSI Ass t of: ter su ance wit accord for wa time by ons. In respec27-2 rk in pipes Conditi the time to Kitema in the from from ISO 44 lene (PE) the as or d at ng thy to use update vided meani Polye same Licence nce pro may be the and as Lice e t this righ mark, shall hav ailed on es the the Kite Licence t(s) det This issu the use of s in this Produc ing ined term t of the govern All def respec in s"). tion horized "Condi rk is aut Kitema of the The use s. addres above
This cert
Licence
that:
t Indu Branch strial of Abu Co LLC Dhabi ICAD 1 Abu Dh abi United Arab Em irates
Branch ICAD abi irates Abu Dh Arab Em United
that:
nce rk Lice Kitema
Certific
™
546726
t oplas Cosm of Abu Dhabi 1
546725
to certify This is
Kitema rk
No. KM
This is to certify
3
1 of Page
3
Issue: 3/10/2 014
First Issu ed: 3/1 0/2014 Latest
Issue:
3/10/2 014
This Licen To chec ce remains the k its valid ity telep property of The Informati hone +44 British Stan (0)845 BSI Assu on and conta 080 9000 dards Instit ct: BSI, ution and A mem rance UK Limit Kitem ber of shall be the BSI ed, ed ark Court, Davy returned Group immediate of Com in England unde Avenue, Know panies. ly upon lhill, r number request. 7805321, Milton Keyn es MK5 at 389 8PP. Tel: Chiswick +44 845 High Road 080 9000 , London, . W4 4AL, UK.
Page 1 of
2
Page 1 of
2
Version 2 - Issue 5 - August 2016
6. TEST CERTIFICATES/TECHNICAL DATA SHEET
CERTIFICATE IQNet and AIB-VINÇOTTE International hereby certify that the organization
Cosmoplast Al Riyadh Co. (LLC) Street No. 100, New Industrial Area 2 PO Box 40814 Riyadh 11511 (Kingdom Saudi Arabia) for the following field of activities Development, manufacturing & sale of following products. Unplasticized Polyvinyl chloride pipes, Polyethylene pipes, Polypropylene pipes Disposable Expanded polystyrene cups, Disposable Expanded polystyrene trays, and Disposable Polypropylene cups has implemented and maintains a
Management System which fulfils the requirements of the following standard
ISO 9001:2008 Issued on : 18 July 2016 Validity date : 14 September 2018 Registration Number : BE-16 QMS 6073
Michael Drechsel President of IQNet
Bart Janssens Chairman Certification Committee
IQNet Partners*: AENOR Spain AFNOR Certification AIB-Vinçotte International Belgium APCER Portugal CCC Cyprus CISQ Italy CQC China CQM China CQS Czech Republic Cro Cert Croatia DQS Holding GmbH FCAV Brazil FONDONORMA Venezuela ICONTEC Colombia IMNC Mexico Inspecta Certification Finland INTECO Costa Rica IRAM Argentina JQA Japan KFQ Korea MIRTEC Greece MSZT Hungary Nemko AS Norway NSAI Ireland PCBC Poland Quality Austria Austria RR Russia SIGE Mexico SII Israel SIQ Slovenia SIRIM QAS International Malaysia SQS Switzerland SRAC Romania TEST St Petersburg Russia TSE Turkey YUQS Serbia IQNet is represented in the USA by: AFNOR Certification, CISQ, DQS Holding GmbH and NSAI Inc. * The list of IQNet partners is valid at the time of issue of this certificate. Updated information is available under www.iqnet-certification.com
CERTIFICATE EN ISO 9001 : 2008 Quality Management System AIB-VINCOTTE International nv/sa Jan Olieslagerslaan 35, 1800 Vilvoorde, Belgium
This is to certify that
Cosmoplast Al Riyadh Co. (LLC)
Located at
Street No. 100, New Industrial Area 2 PO Box 40814 Riyadh 11511 Kingdom Saudi Arabia
has established and maintains a quality system according the requirements of EN ISO 9001 : 2008 “Quality Management System” for:
Development, manufacturing & sale of following products. - Unplasticized Polyvinyl chloride pipes - Polyethylene pipes - Polypropylene pipes - Disposable Expanded polystyrene cups - Disposable Expanded polystyrene trays, and - Disposable Polypropylene cups This certificate is based on the result of a quality audit documented in the audit report VIME/Q066/0714 Cert. Certificate number: 16 QMS 6073 Valid from 18 July 2016 to 14 September 2018 Further clarifications regarding the scope of this certificate and the applicability of EN ISO 9001 : 2008 requirements may be obtained by consulting the organization. This certificate is granted during the Certification Commission of 18 July 2016 and is subject to the General Regulations of AIB-VINÇOTTE International nv/sa.
Signed for the certification body:
Bart Janssens Chairman Certification Committee
AIB-VINÇOTTE International Ltd Head office: Diamant Building – A. Reyerslaan 80 – B-1030 Brussels Company nr: BE 0462.513.222 – TRB: 621315 – Internet: www.vincotte.com Safety, quality and environmental services --------------------------------------------------------------------------------------------------------------------------------------VINÇOTTE CERTIFICATION Business Class Kantorenpark - Jan Olieslagerslaan 35 – B-1800 Vilvoorde Telephone: +32 (0)2/674.57.84 - Fax: +32 (0)2/674.59.62 E-mail:
[email protected] – Internet: www.vincotte-certification.com
AUDIT REPORT AIB-Vinçotte INTERNATIONAL Ltd, Brussels - Belgium
ISO9001:2008 Management System Certification Stage 2 Certification Audit Cosmoplast Al Riyadh Co. L.L.C. Street No. 100, New Industrial Area 2, P. O. Box 40814, Riyadh 11511, Kingdom of Saudi Arabia Lead auditor: Darshan Vaidya
Audit date(s): Report number: TD-Q05-10E/May13
May 23-24, 2016 UAE/502/QMS-stage2/0516
Page 2 of 15 COSMOPLAST AL RIYADH CO LLC Report number: UAE/502/QMS-stage2/0516
istrative data Company name
Cosmoplast Al Riyadh Co. L.L.C.
Company address
Street No. 100, New Industrial Area 2, P. O. Box 40814, Riyadh 11511, KSA
Management Representative Hazem Hamzah, Quality Director Telephone
+966 11 448 3344 Fax
E-mail
[email protected]
Concerned sites
Al Hokair Industrial Area, Hair Street, Riyadh Al Kharj Road, Kingdom of Saudi Arabia
Employees
250
Sector
14B - Plastic
Certificate number
16 QMS 6073 valid 14 September 2018
Activity mentioned on the certificate
+966 11 448 0246
Development, manufacturing & sale of following products. 1.
Unplasticized Polyvinyl chloride pipes
2.
Polyethylene pipes
3.
Polypropylene pipes
4.
Disposable Expanded polystyrene cups
5.
Disposable Expanded polystyrene trays, and
6.
Standard of reference
ISO9001:2008
Audit date(s)
Preparation visit
Disposable Polypropylene cups
: March 23, 2015
Execution of the audit : May 23-24, 2016 Number of audit days
Preparation visit
: One man-day
Execution of the audit : Two man-days
Auditor(s)
Darshan Vaidya (lead auditor)
Page 3 of 15 COSMOPLAST AL RIYADH CO LLC Report number: UAE/502/QMS-stage2/0516
Accompanying persons None Audit objective
Certification audit Evaluation of the compliance of the implemented quality management system with the reference standard. Evaluation of the effective implementation of the quality management system. Evaluation of the ability of the management system to ensure the client organization meets applicable statutory, regulatory and contractual requirements.
Page 4 of 15 COSMOPLAST AL RIYADH CO LLC Report number: UAE/502/QMS-stage2/0516
Summary The audited organization has established and implemented a quality management system according to the requirements of the reference standard. The audit process was based on a sample of the available information. During the audit, the documentation and the application of the system have been reviewed. No evidence of misuse of the certificate or the Vinçotte logo was found.
General appreciation of the quality management system by the lead auditor The documented and implemented quality management system complies with the applicable requirements of the reference standard with exception of: NIL major non-conformance(s) FIVE minor non-conformance(s) NIL minor or major non-conformance(s) remain open from previous audit.
A detailed overview of the observations (positive remarks, opportunities of improvement and non-conformities) is listed in the following chapters.
Conclusion and recommendation of the lead auditor The lead auditor recommends to the Certification Commission to grant the ISO9001:2008 certificate to the audited organization.
Page 5 of 15 COSMOPLAST AL RIYADH CO LLC Report number: UAE/502/QMS-stage2/0516
Further Process Audit and follow-up matrix The next matrix lists (as identified by the organization) the audited processes/departments, which will be reviewed during the surveillance audits.
Audit Process/Department
Owner/Responsible C
1
2
Management Responsibility
Executive Director / General Manager
X
X
X
Quality Management System
Management Representative
X
X
X
Pipeline Division – Production
Plant Manager / Production Manager
X
Thermoforming Division – Production
Production Manager
X
Maintenance (Pipeline)
Plant Manager
X
Maintenance (Thermoforming)
Production Manager
X
Quality Control
Quality Control Manager
X
Stores
Stores Manager
X
X
Purchase
Purchase Manager
X
X
Sales (Pipeline)
Sales Manager
X
X
Human Resources & istration
HR, and Finance Manager
X
X
X X X X X
(C = Certification audit - R = Renewal audit - 1,2,3,4 = Surveillance audit n° 1, 2, 3, 4 - P = Post-audit)
Compliance of the quality management system will be verified by conducting surveillance audits. A total of [surveillances] surveillance audits will be carried out for 2 day(s) each within the 3-year’s validity of the certificate.
These surveillance audits took or will take place in:
Surveillance Audits Schedule st
May 2017
nd
May 2018
1 Surveillance Audit 2 Surveillance Audit
Page 6 of 15 COSMOPLAST AL RIYADH CO LLC Report number: UAE/502/QMS-stage2/0516
An appointment will be taken in due time.
Recertification has to be foreseen before expiry of the certificate (September 2018).
Audit team Team 1 (T1):
Darshan Vaidya (Lead Auditor)
Agenda Stage 1 of the audit This stage 1 audit has been performed during a preliminary visit made on site. March 22, 2015 0900 – 1700 Documentation review, visit of the premises, acquaintance with the organization, the activities and the processes, verification of the scope of the quality management system, preparation and planning of stage 2 of the audit, …
Stage 2 of the audit May 23, 2016 0830 – 0900 0900 – 0930 0930 – 1000 1010 – 1200 1200 – 1300 1300 – 1330 1330 – 1445 1450 – 1600 1600 – 1730
Opening Meeting Facility Tour Management Responsibility Management System Performance Review Sales (Pipeline) Lunch Production (Thermoforming) Maintenance (Thermoforming) HR & istration
T1 T1 T1 T1 T1
Production (Pipeline) Maintenance (Pipeline) Quality Control Lunch Break Stores Purchase Auditors review Closing meeting
T1 T1 T1
T1 T1 T1
May 24, 2016 0830 – 1100 1100 – 1200 1200 – 1300 1300 – 1330 1330 – 1430 1430 – 1530 1530 – 1630 1630 – 1700
T1 T1 T1 T1
Page 7 of 15 COSMOPLAST AL RIYADH CO LLC Report number: UAE/502/QMS-stage2/0516
Changes in the audit data Changes in the organization:
no
Comment:
Changes in the scope/activities/products:
no
Comment:
Changes in the exclusions of the standard:
no
Comment: The company does not claim any exclusion.
Changes in the outsourced processes:
no
Comment:
Changes in the proposed audit schedule: Comment:
no
Page 8 of 15 COSMOPLAST AL RIYADH CO LLC Report number: UAE/502/QMS-stage2/0516
Audit findings Type
1
Process / Department
Requirement of the standard
Findings
POS
Management
ISO9001, 4.2.2
Quality manual (dated 05 Oct 2015, QSM, Rev. 00) has been revised and the scope of the quality management system is defined as item 1 scope.
POS
Management
ISO9001, 5.4.1
The quality policy was noted to be revised and reissued on 25 August 2015 and it was relevant to the purpose of the organization.
POS
Quality Control
ISO9001, 7.6
In Thermoforming Calibration of the QC lab instruments was seen. Vernier Caliper (05135320) was calibrated (expiry on 06 Apr 2017) and Digital Micro Meter (expiry on 06 Apr 2017) was calibrated. Calibration for weighing scales was also ensured as was seen from the calibration certificates. Weighing scale 75-176017 was seen expiry on 20 Apr 2017.
POS
Production (Pipeline)
ISO9001, 8.2.3
The production data capturing in Pipeline division was noted to be well controlled and all data was being captured diligently and analysed for variations. All production forms were noted to be fully utilised as all data parameters required by the form was being captured.
POS
Quality Control (Pipeline and Thermoforming)
ISO9001, 7.1
Quality control function is Thermoforming as well as in Pipeline divisions was functioning in a good manner as per ITP as was seen from various Quality Control reports.
POS
Customer complaints and customer satisfaction (Pipeline and Thermoforming)
ISO9001, 7.2.3 and 8.2.1
Quality manual (dated 05 Oct 2015, QSM, Rev. 00) has been revised and the interaction of various processes including how sales process interacts with other departments in Thermoforming division and Pipeline division is clearly shown in Process Flow Chart (QMS Process Interaction, dated 05 October 2015, QSM, F-03, Rev. 00). Customer is collected from SETCO who is the only customer for thermoforming division. dated (20 Dec 2015 and 10 Feb 2016 were seen. Customer complaints have been recorded and actions were
1
POS: Positive points are an aspect of the Management system on which the organization either exceeds the audit standard or distinguishes itself by its performance, method or technique. OFI: Opportunities for improvement are NOT non-conformities against the reference standard. They are communicated without obligation and with the only purpose to improve the system within the company. ATP: Attention points: any useful critical findings worth to mention, included: (“half” or “nearly”) non-conformities, warning (danger of possible future non-conformities), other weak points (other unfavorable circumstances), remarks, on-going actions (to follow-up during the next audits), particular expectations for the future…: all what request action or attention by the client, and possible follow-up by any auditor. MIN: Minor non-conformity: non-satisfaction of a requirement of a standard not constituting an important risk to the management system. MAJ: Major non-conformity: a repetitive non-conformity or the failure to observe an important specific requirement of the management system.
Page 9 of 15 COSMOPLAST AL RIYADH CO LLC Report number: UAE/502/QMS-stage2/0516
Type
1
Process / Department
Requirement of the standard
Findings
noted to be taken on the complaints that were received and logged in the customer complaints log. POS
Stores
ISO9001, 7.5.5
The store located in Al Kharj was noted to be well maintained and it was noted that raw material stock along with its location was being entered in the stock list and the list kept up-to-date. Finished product tracking was also being done to ensure easy traceability and verification.
OFI
Customer complaints and customer satisfaction (Pipeline)
ISO9001, 7.2.3 and 8.2.1
It is recommendation to analyze the captured customer information and have discussion on this analysis in the management review meeting.
OFI
Maintenance (Thermoforming)
ISO9001, 6.3
Maintenance was done and the records such as daily maintenance report were seen. Daily preventive checklist – sheet extruders. It is recommended to mention the problems that are encountered in the day to day issues that are faced by the maintenance in to the report so that accuracy of the data can be ensured.
OFI
Quality Control (Thermoforming)
ISO9001, 7.5.3
Quality control “Inspectors Machine Log for Inspectors Tray Section” is being filled in the (hard copy) and also on the computer. It is recommended to use only one. It is also recommended not to print “Inspectors Machine Log for Inspectors Tray Section” as this information is entered in the computer. EPS Section QC Inspection Report (dated May 22, 2016) was seen.
OFI
Human Resources
ISO9001, 4.2.4
It is recommended to maintain the Employee Files in a systematic way through use of checklist as well as separators to ensure easy traceability and retrieval. It is recommended to ensure that format of Job Description is consistently applied. Difference of format was noted between Job Descriptions of Plant Manager and HR Coordinator.
ATP
Management (Exclusion)
ISO9001, 4.2.2
The organization does not claim any exclusion however it is mentioned on page 12 of 15 in item 7.5 that “Cosmoplast does not require any validation procedure” which is not in line with the operations of the organization.
ATP
Management (Quality Manual)
ISO9001, 5.5
It is recommended to review and revise the item 5.5 in the quality manual (dated 05 Oct 2015, QSM, Rev. 00) which describes the positions of General Manager (Harwal), General Manager, Deputy General Manager and General Manager, Infrastructure Products which is not in line with the organization chart (TF) dates 05 October 2015 and organization chart (Pipeline Division) dated 05 October 2015.
ATP
Management (Document Control)
ISO9001, 4.2.3 & 4.2.4
Process of document and record control is described through documented procedure (QPRM01) however the procedure specifies the disposal method as tearing. The retention period was defined as one year for many quality control documents instead of three years. The process of control of documents of external origin was not clearly mentioned. List of quality records as mentioned in QPRM01 was documented and available at the time of audit.
Page 10 of 15 COSMOPLAST AL RIYADH CO LLC Report number: UAE/502/QMS-stage2/0516
Type
1
Process / Department
Requirement of the standard
Findings
ATP
Human Resources
ISO9001, 6.2.2
Although the trainings were being conducted such as Train the Trainer, housekeeping, familiarization on machines and equipment and familiarization of manpower, training needs analysis was not available at the time of audit.
ATP
Production (Thermoforming)
ISO9001, 6.1
Safety requirement such as use of ear plugs in high noise areas was not being implemented as required in the Thermoforming Division.
ATP
Production (Thermoforming)
ISO9001, 7.5.3
In Production in the Thermoforming Division, it was noted that on some products, no date of manufacturing was indicated (Expanded polystyrene trays 500pcs type 53).
ATP
Quality Control (Thermoforming)
ISO9001, 7.5.3
In Thermoforming Quality Control, non-conformities were noted to be given however evidence of tracking of nonconformities through a non-conformity log was not in evidence.
ATP
Purchasing
ISO9001, 7.4
It is recommended to add the criteria for evaluation and reevaluation of suppliers in the purchase department as this will enable evaluation of only important suppliers.
ATP
Human Resources / Production
ISO9001, 6.2.2
It is recommended to have training (internal) for the forklift drivers.
ATP
Sales
ISO9001, 7.2.3 and 8.2.1
In Pipeline Sales, it is recommended to capture performance of customer service process, data on old v/s new customer visits, follow-up frequency on quotations and lost business analysis. It is also required that all customer complaints regardless of the reason be captured and analysed.
MIN
Management (Management Review)
ISO9001, 5.6
Management review meeting was conducted on March 11, 2015 however results of audits, customer and process performance & product conformity were not discussed in adequate detail as mentioned in the quality manual, item 5.6 (dated 05 Oct 2015, QSM, Rev. 00) should be discussed.
MIN
Management (Internal audit)
ISO9001, 8.2.2
Internal audit was conducted on 26 October 2015 in thermoforming division however some of the functions such as istration/HR, Stores, Top management and Purchase were not audited.
MIN
Management (Nonconformance)
ISO9001, 8.5.2
In the internal audit, non-conformances were given however it was noted that the format of the corrective/preventive action (QLA-03, rev. 01, 05 Jan 2016) did not require that cause be analyzed for the non-conformances.
MIN
Management (Quality objectives)
ISO9001, 5.4.1
Documented Quality Objectives were not available for Stores. Quality Objectives were not measurable for Stores (Thermoforming and Pipeline), Human Resources and Maintenance (Pipeline).
MIN
Management (Infrastructure)
ISO9001, 6.3
In Al Kharj Pipeline division, firefighting system was installed and commissioned however at the time of audit the switch for all pumps was on “off” position.
Page 11 of 15 COSMOPLAST AL RIYADH CO LLC Report number: UAE/502/QMS-stage2/0516
Corrective action request CAR n°: 01
Department: Management
Requirement of the standard: ISO9001, 5.6
Written by: Darshan Vaidya
Date: 24 May 2016
Non conformity: Minor
Non conformity: Management review meeting was conducted however some of the agenda items were not evidenced to have been discussed. Objective evidence: Management review meeting was conducted on March 11, 2015 however results of audits, customer and process performance & product conformity were not discussed in adequate detail as mentioned in the quality manual, item 5.6 (dated 05 Oct 2015, QSM, Rev. 00) should be discussed. Requested correction: Yes
Requested corrective action: Yes
TO BE COMPLETED BY THE ORGANIZATION AND RETURNED TO THE LEAD AUDITOR WITHIN 5 DAYS
Correction(s) (Accepted / Refused):
Cause(s):
Corrective(s) action(s): (Accepted / Refused):
Planned end of implementation date:
Written by:
TO BE COMPLETED BY VINÇOTTE The lead auditor accepts/doesn’t accept the proposed correction(s) and/or corrective action(s).
Final evaluation: satisfactory/unsatisfactory Seen:
By:
Date:
Page 12 of 15 COSMOPLAST AL RIYADH CO LLC Report number: UAE/502/QMS-stage2/0516
Corrective action request CAR n°: 02
Department: Management
Requirement of the standard: ISO9001, 5.6
Written by: Darshan Vaidya
Date: 24 May 2016
Non conformity: Minor
Non conformity: Internal audit was conducted however some of the processes were not evidenced to have been audited. Objective evidence: Internal audit was conducted on 26 October 2015 in thermoforming division however some of the functions such as istration/HR, Stores, Top management and Purchase were not audited. Requested correction: Yes
Requested corrective action: Yes
TO BE COMPLETED BY THE ORGANIZATION AND RETURNED TO THE LEAD AUDITOR WITHIN 5 DAYS
Correction(s) (Accepted / Refused):
Cause(s):
Corrective(s) action(s): (Accepted / Refused):
Planned end of implementation date:
Written by:
TO BE COMPLETED BY VINÇOTTE The lead auditor accepts/doesn’t accept the proposed correction(s) and/or corrective action(s).
Final evaluation: satisfactory/unsatisfactory Seen:
By:
Date:
Page 13 of 15 COSMOPLAST AL RIYADH CO LLC Report number: UAE/502/QMS-stage2/0516
Corrective action request CAR n°: 03
Department: Management
Requirement of the standard: ISO9001, 8.5.2
Written by: Darshan Vaidya
Date: 24 May 2016
Non conformity: Minor
Non conformity: Cause analysis was not required as per the format of the corrective/preventive action form. Objective evidence: In the internal audit, non-conformances were given however it was noted that the format of the corrective / preventive action (QLA-03, rev. 01, 05 Jan 2016) did not require that cause be analyzed for the nonconformances. Requested correction: Yes
Requested corrective action: Yes
TO BE COMPLETED BY THE ORGANIZATION AND RETURNED TO THE LEAD AUDITOR WITHIN 5 DAYS
Correction(s) (Accepted / Refused):
Cause(s):
Corrective(s) action(s): (Accepted / Refused):
Planned end of implementation date:
Written by:
TO BE COMPLETED BY VINÇOTTE The lead auditor accepts/doesn’t accept the proposed correction(s) and/or corrective action(s).
Final evaluation: satisfactory/unsatisfactory Seen:
By:
Date:
Page 14 of 15 COSMOPLAST AL RIYADH CO LLC Report number: UAE/502/QMS-stage2/0516
Corrective action request CAR n°: 04
Department: Management
Requirement of the standard: ISO9001, 5.4.1
Written by: Darshan Vaidya
Date: 24 May 2016
Non conformity: Minor
Non conformity: Some documented quality objectives were not measurable and in one case not set for a process. Objective evidence: Documented Quality Objectives were not available for Stores. Quality Objectives were not measurable for Stores (Thermoforming and Pipeline), Human Resources and Maintenance (Pipeline). Requested correction: Yes
Requested corrective action: Yes
TO BE COMPLETED BY THE ORGANIZATION AND RETURNED TO THE LEAD AUDITOR WITHIN 5 DAYS
Correction(s) (Accepted / Refused):
Cause(s):
Corrective(s) action(s): (Accepted / Refused):
Planned end of implementation date:
Written by:
TO BE COMPLETED BY VINÇOTTE The lead auditor accepts/doesn’t accept the proposed correction(s) and/or corrective action(s).
Final evaluation: satisfactory/unsatisfactory Seen:
By:
Date:
Page 15 of 15 COSMOPLAST AL RIYADH CO LLC Report number: UAE/502/QMS-stage2/0516
Corrective action request CAR n°: 05
Department: Management
Written by: Darshan Vaidya
Requirement of the standard: ISO9001, 6.3
Date: 24 May 2016
Non conformity: Minor
Non conformity: Fire-fighting infrastructure was not operational at the time of audit. Objective evidence: In Al Kharj Pipeline division, firefighting system was installed and commissioned however at the time of audit the switch for all pumps was on “off” position. Requested correction: Yes
Requested corrective action: Yes
TO BE COMPLETED BY THE ORGANIZATION AND RETURNED TO THE LEAD AUDITOR WITHIN 5 DAYS
Correction(s) (Accepted / Refused):
Cause(s):
Corrective(s) action(s): (Accepted / Refused):
Planned end of implementation date:
Written by:
TO BE COMPLETED BY VINÇOTTE The lead auditor accepts/doesn’t accept the proposed correction(s) and/or corrective action(s).
Final evaluation: satisfactory/unsatisfactory Seen:
By:
Date:
An NSF International Company ssdv
TEST REPORT Client:
Cosmoplast Al Riyadh Company (LLC)
Product:
HDPE Pipe
Tests Undertaken:
BS 6920 Suitability of non-metallic products for use in with water intended for human consumption with regard to their effect on the quality of the water
Report Number:
MAT/LAB 252L
Date of Report:
12th October 2016
Unit 30 Fern Close | Pen-y-Fan Industrial Estate | Oakdale | Gwent | NP11 3EH | UK Tel: +44 (0) 1495 236 260 | Fax: +44 (0) 1495 242 499 Email:
[email protected] | Website: www.nsfwrc.org 0626 1
© NSF-WRc Ltd 2016 WORK/MAT 012
Page 1 of 13 Revision No. 9, 13/10/14
NSF-WRc Test Report Client:
Cosmoplast Al Riyadh Company (LLC)
Product:
HDPE Pipe
Test Criteria:
BS 6920
Commercial in Confidence
CONTENTS Contents ................................................................................................................................ 2 1. Executive Summary ....................................................................................................... 3 2. Samples for Testing ....................................................................................................... 4 3. Odour and Flavour of Water ........................................................................................... 6 4. Appearance of Water ..................................................................................................... 8 5. Growth of Microorganisms.............................................................................................. 9 6. The Extraction of Substances that may be of Concern to Public Health ........................10 7. The Extraction of Metals ................................................................................................12 Notes....................................................................................................................................13
Report Number:
MAT/LAB 252L
Date of Report:
12th October 2016
WORK/MAT 012
Page 2 of 13 © NSF-WRc Ltd 2016 Revision No. 9, 13/10/14
NSF-WRc Test Report
Commercial in Confidence
Client:
Cosmoplast Al Riyadh Company (LLC)
Product:
HDPE Pipe
Test Criteria:
BS 6920
1.
EXECUTIVE SUMMARY
Test
Result
Odour and flavour of water
Appearance of water
Growth of aquatic microorganisms
The extraction of substances that may be of concern to public health
Extraction of metals
This product has satisfied the criteria set out in BS 6920: Part 1: 2014 “Specification” and thus is suitable for use with hot (up to 65 C) and cold water.
Mr Michael Bustin, Materials Testing Manager
Date 12th October 2016
Please note the following statements a)
The samples of the product referred to in this report have been tested in accordance with the methods specified in BS 6920 Suitability of non-metallic products for use in with water intended for human consumption with regard to their effect on the quality of the water.
b)
This work has been undertaken in the UKAS accredited laboratory of NSF-WRc Ltd Oakdale, UKAS registration number 0626, unless otherwise stated. Opinions and interpretations expressed herein are outside the scope of UKAS accreditation.
c)
The results specified in this report relate only to the samples(s) of this product submitted for testing. Any changes in the nature or source of ingredients and the process of manufacturer or application could affect the suitability of this product for use in with potable water.
d)
We draw to your attention that reports issued by the accredited test laboratories do not of themselves constitute approval by the Water Regulations Advisory Scheme or the test laboratory. Only a letter from the Scheme, citing a Directory Reference number can be regarded as indicating approval.
e)
Materials and products intended for use by a public water supply company in the preparation or conveyance of water may need to satisfy more comprehensive toxicological requirements as specified by the Drinking Water Inspectorate. These additional requirements are necessary to ensure Water Company usage complies with Regulation 31 of the Water Supply (Water Quality) Regulations 2010.
Report Number:
MAT/LAB 252L
Date of Report:
12th October 2016
WORK/MAT 012
Page 3 of 13 © NSF-WRc Ltd 2016 Revision No. 9, 13/10/14
NSF-WRc Test Report
Commercial in Confidence
Client:
Cosmoplast Al Riyadh Company (LLC)
Product:
HDPE Pipe
Test Criteria:
BS 6920
2.
SAMPLES FOR TESTING
BS 6920: Part 2: Section 2.1 and in-house method PROC/MAT 001. name
Mohammed Hammad Ahmed
Name of organisation
Cosmoplast Al Riyadh Company(LLC)
Address
Street No.141 2nd Industrial Area P.O. Box 40814 Riyadh 11511 Kingdom Of Saudi Arabia
Product
HDPE Pipe
Product manufacturer
Cosmoplast Al Riyadh Company (LLC)
Submitting organisation
Cosmoplast Al Riyadh Company (LLC)
Product manufacturing site
Saudi Arabia
Method of manufacture
Extrusion
Trade name and reference of product
Cosmoplast PE100 (Tasnee) Pipe (KSA)
General nature of product
HDPE
Typical use of the product
Conveyance of potable water
Material manufacturer
Tasnee
Trade name and reference of material
Tasnee 100 Grade PE100
Material manufacturing site
Saudi Arabia
Receipt conditions
In good condition
Receipt packaging
Cardboard outer
Storage conditions
As in BS 6920: Part 2: Section 2.1: Clause 5.2
Description/appearance of the product for testing
Black opaque rigid pipe
Report Number:
MAT/LAB 252L
Date of Report:
12th October 2016
WORK/MAT 012
Page 4 of 13 © NSF-WRc Ltd 2016 Revision No. 9, 13/10/14
NSF-WRc Test Report
Commercial in Confidence
Client:
Cosmoplast Al Riyadh Company (LLC)
Product:
HDPE Pipe
Test Criteria:
BS 6920
Number of articles constituting a sample
1 cut length of pipe
Surface area for test
15,000 mm2
Calibration mark of test container
1L
Date of receipt of application form
04/07/16
Date of receipt of product for test
04/07/16
Test sample preparation
Sample prepared by manufacturer
Date test sample manufactured
12/04/16
Batch number
HDPE-RE1674W03
Report Number:
MAT/LAB 252L
Date of Report:
12th October 2016
WORK/MAT 012
Page 5 of 13 © NSF-WRc Ltd 2016 Revision No. 9, 13/10/14
NSF-WRc Test Report
Commercial in Confidence
Client:
Cosmoplast Al Riyadh Company (LLC)
Product:
HDPE Pipe
Test Criteria:
BS 6920
3.
ODOUR AND FLAVOUR OF WATER
Methodology: BS 6920: Part 2: Section 2.2.1 and in-house method PROC/MAT 004 and 006. Date leaching tests started: 11/09/16
Date leaching tests finished: 12/09/16
Number of lists: 3
Temperature of extraction: (23 ±2) °C
Odour test Extract
Date of test
Test water
Dilution number$
Odour descriptor
First
12/09/16
Chlorine free
0(0)
None
First
12/09/16
Chlorinated
0(0)
None
Final
-
Chlorine free
-
-
Final
-
Chlorinated
-
-
Extract
Date of test
Test water
Dilution number$
First
12/09/16
Chlorine free
1(0)
None
First
12/09/16
Chlorinated
1(0)
None
Final
-
Chlorine free
-
-
Final
-
Chlorinated
-
-
Flavour test
$
Flavour descriptor
figure in brackets is the number of lists detecting an odour or flavour at this dilution
First extract becomes final extract On the basis of these results the samples of this product referred to in this report have been found to conform to the requirements of BS 6920: Part 1: 2014, Clause 4
Report Number:
MAT/LAB 252L
Date of Report:
12th October 2016
WORK/MAT 012
Page 6 of 13 © NSF-WRc Ltd 2016 Revision No. 9, 13/10/14
NSF-WRc Test Report
Commercial in Confidence
Client:
Cosmoplast Al Riyadh Company (LLC)
Product:
HDPE Pipe
Test Criteria:
BS 6920
Date leaching tests started: 13/09/16
Date leaching tests finished: 22/09/16
Number of lists: 3
Temperature of extraction: (65 ±2) °C
Odour test Extract
Date of test
Test water
Dilution number$
Odour descriptor
First
14/09/16
Chlorine free
0(0)
None
First
14/09/16
Chlorinated
0(3)
Rotten, Burnt, Musty
Final
-
Chlorine free
-
Final
22/09/16
Chlorinated
0(1)
Extract
Date of test
Test water
Dilution number$
First
14/09/16
Chlorine free
1(0)
First
14/09/16
Chlorinated
Final
-
Chlorine free
-
Final
22/09/16
Chlorinated
1(0)
Rubber
Flavour test
$
Flavour descriptor None
Not suitable for flavour; failed odour None
figure in brackets is the number of lists detecting an odour or flavour at this dilution
On the basis of these results the samples of this product referred to in this report have been found to conform to the requirements of BS 6920: Part 1: 2014, Clause 4
Report Number:
MAT/LAB 252L
Date of Report:
12th October 2016
WORK/MAT 012
Page 7 of 13 © NSF-WRc Ltd 2016 Revision No. 9, 13/10/14
NSF-WRc Test Report
Commercial in Confidence
Client:
Cosmoplast Al Riyadh Company (LLC)
Product:
HDPE Pipe
Test Criteria:
BS 6920
4.
APPEARANCE OF WATER
Methodology: BS 6920: Part 2: Section 2.3 and in-house methods PROC/MAT 004, PROC/MAT 027 (colour) and PROC/MAT 030 (turbidity). Date leaching tests started: 23/08/16
Date leaching tests finished: 24/08/16
Temperature of extraction: (65 ±2) °C
Colour Extract
Date of test
Hazen units
Test sample
Blank
Extract
effect
First
24/08/16
<2
<2
<2
Final
-
-
-
-
Turbidity Extract
Date of test
Formazine Nephelometric units
Test sample
Blank
Extract
effect
First
24/08/16
0.089
0.120
0.031
Final
-
-
-
-
First extract becomes final extract On the basis of these results the samples of this product referred to in this report have been found to conform to the requirements of BS 6920: Part 1: 2014, Clause 5
Report Number:
MAT/LAB 252L
Date of Report:
12th October 2016
WORK/MAT 012
Page 8 of 13 © NSF-WRc Ltd 2016 Revision No. 9, 13/10/14
NSF-WRc Test Report
Commercial in Confidence
Client:
Cosmoplast Al Riyadh Company (LLC)
Product:
HDPE Pipe
Test Criteria:
BS 6920
5.
GROWTH OF MICROORGANISMS
Methodology: BS 6920: Part 2: Section 2.4 and in-house method PROC/MIC 001. Date testing started: 02/08/16
Date testing finished: 20/09/16
Incubation temperature: (30 ±1) °C Mean dissolved oxygen difference MDOD (mg L-1 O2) Test sample
0.1
Positive reference (paraffin wax)
6.4
Negative reference (glass)
0.0
Test water control dissolved oxygen (mg L-1 O2)
7.6
Comments on changes in appearance of test material and any visible microbial growth
At the end of this test, the test sample showed no change in colour or appearance.
On the basis of these results the samples of this product referred to in this report have been found to conform to the requirements of BS 6920: Part 1: 2014, Clause 6
Report Number:
MAT/LAB 252L
Date of Report:
12th October 2016
WORK/MAT 012
Page 9 of 13 © NSF-WRc Ltd 2016 Revision No. 9, 13/10/14
NSF-WRc Test Report
Commercial in Confidence
Client:
Cosmoplast Al Riyadh Company (LLC)
Product:
HDPE Pipe
Test Criteria:
BS 6920
6.
THE EXTRACTION OF SUBSTANCES THAT MAY BE OF CONCERN TO PUBLIC HEALTH
Methodology: BS 6920: Part 2: Section 2.5 and in-house methods PROC/MAT 004 and PROC/MIC 004. Date leaching tests started: 26/07/16
Date leaching tests finished: 27/07/16
Temperature of extraction: (23 ±2) °C
Test Set-up
Date: 27/07/16
Cell concentration used
5 x 105
Cell morphology
Confluent growth of elongated cells, some round cells and cell debris. Media orange/pink in colour.
Test Results
Date: 28/07/16
Sample/Control
Cell morphology
Response
Test sample
Confluent growth of elongated cells, some round cells and cell debris. Media pink in colour.
Non-cytotoxic
Blank
Confluent growth of elongated cells, some round cells and cell debris. Media pink in colour.
Non-cytotoxic
Negative control
Confluent growth of elongated cells, some round cells and cell debris. Media pink in colour.
Non-cytotoxic
Positive control
All cells rounded and mainly still in suspension. Media pink in colour.
Cytotoxic
On the basis of these results the samples of this product referred to in this report have been found to conform to the requirements of BS 6920: Part 1: 2014, Clause 7
Report Number:
MAT/LAB 252L
Date of Report:
12th October 2016
WORK/MAT 012
Page 10 of 13 © NSF-WRc Ltd 2016 Revision No. 9, 13/10/14
NSF-WRc Test Report
Commercial in Confidence
Client:
Cosmoplast Al Riyadh Company (LLC)
Product:
HDPE Pipe
Test Criteria:
BS 6920
Date leaching tests started: 23/08/16
Date leaching tests finished: 24/08/16
Temperature of extraction: (65 ±2) °C
Test Set-up
Date: 24/08/16
Cell concentration used
5 x 105
Cell morphology
Confluent growth of elongated cells, some round cells and cell debris. Media orange/pink in colour.
Test Results
Date: 25/08/16
Sample/Control
Cell morphology
Response
Test sample
Confluent growth of elongated cells, some round cells and cell debris. Media pink in colour.
Non-cytotoxic
Blank
Confluent growth of elongated cells, some round cells and cell debris. Media pink in colour.
Non-cytotoxic
Negative control
Confluent growth of elongated cells, some round cells and cell debris. Media pink in colour.
Non-cytotoxic
Positive control
All cells rounded and mainly still in suspension. Media pink in colour.
Cytotoxic
On the basis of these results the samples of this product referred to in this report have been found to conform to the requirements of BS 6920: Part 1: 2014, Clause 7
Report Number:
MAT/LAB 252L
Date of Report:
12th October 2016
WORK/MAT 012
Page 11 of 13 © NSF-WRc Ltd 2016 Revision No. 9, 13/10/14
NSF-WRc Test Report
Commercial in Confidence
Client:
Cosmoplast Al Riyadh Company (LLC)
Product:
HDPE Pipe
Test Criteria:
BS 6920
7.
THE EXTRACTION OF METALS
Methodology: BS 6920: Part 2: Section 2.6 and in-house methods PROC/MAT 006 (leachate preparation) and PROC/ING 003 (IMS analysis). Date leaching tests started: 17/08/16
Date leaching tests finished: 18/08/16
Temperature of extraction: (65 ±2) °C
First Extract Date of analysis: 22/08/16
Report No. 051
Metal (g L-1)
MAC (g L-1)
LOD (g L-1)
Blank 1 (g L-1)
Blank 2 (g L-1)
Sample 1 (g L-1)
Sample 2 (g L-1)
Aluminium
200
20
<20
<20
<20
<20
Antimony
5
0.5
<0.5
<0.5
<0.5
<0.5
Arsenic
10
1
<1
<1
<1
<1
Boron
1000
100
<100
<100
<100
<100
Cium
5
0.5
<0.5
<0.5
<0.5
<0.5
Chromium
50
5
<5
<5
<5
<5
Iron
200
20
<20
<20
<20
<20
Lead
10
1
<1
<1
<1
<1
Manganese
50
5
<5
<5
<5
<5
Mercury
1
0.1
<0.1
<0.1
<0.1
<0.1
Nickel
20
2
<2
<2
3
4
Selenium
10
1
<1
<1
<1
<1
Analytical Method - IMS Inductively Coupled Plasma Mass Spectrometry MAC - Maximum issible concentration LOD - Required limit of detection
First extract becomes final extract On the basis of these results the samples of this product referred to in this report have been found to conform to the requirements of BS 6920: Part 1: 2014, Clause 8
Report Number:
MAT/LAB 252L
Date of Report:
12th October 2016
WORK/MAT 012
Page 12 of 13 © NSF-WRc Ltd 2016 Revision No. 9, 13/10/14
NSF-WRc Test Report Client:
Cosmoplast Al Riyadh Company (LLC)
Product:
HDPE Pipe
Test Criteria:
BS 6920
Commercial in Confidence
NOTES 1.
2.
3. 4.
5. 6.
7. 8.
This report is issued in accordance with the laboratory accreditation requirements of the United Kingdom Accreditation Service (UKAS). NSF-WRc is UKAS accredited against ISO/IEC 17025:2005 for calibration and testing, laboratory numbers 0248 and 0626 respectively. For details of the laboratory Schedule of Accreditation please see the UKAS website (www.ukas.org). The laboratory provides traceability of measurement to recognised national standards, and to units of measurement realised at the National Physical Laboratory or other recognised national standards laboratories. Opinions and interpretations in this report are outside the scope of UKAS Accreditation. The results specified in this report relate only to the sample(s) of the product submitted for testing. Any change in the source or nature of the product or materials used in the product, method of manufacture or application could affect the performance of the product. This test report does not constitute approval or endorsement of the product by either NSF-WRc or its parent companies. The contents of this report are the copyright of NSF-WRc Ltd and all rights are reserved. No part of this publication may be reproduced, stored in a retrieval system in any form or by any means electronic, mechanical, photocopying, recording or otherwise, without prior written consent of NSF-WRc Ltd. Any queries regarding this report should be addressed to the authorised signatory at NSF-WRc. Copies of reports are retained by WRc-NSF for ten years after issue. Non UKAS accredited tests or tests which have been subcontracted will be identified in the following manner: Tests marked * are not included in the laboratory’s ISO 17025 accreditation schedule Tests marked $ have not been performed by NSF-WRc and have been performed at an approved subcontract laboratory.
Report Number:
MAT/LAB 252L
Date of Report:
12th October 2016
WORK/MAT 012
Page 13 of 13 © NSF-WRc Ltd 2016 Revision No. 9, 13/10/14
Certificate of Registration QUALITY MANAGEMENT SYSTEM - ISO 9001:2008 This is to certify that:
Cosmoplast Industrial Co LLC Industrial Area No 1 Sharjah 6032 United Arab Emirates
Holds Certificate No:
FM 75767
and operates a Quality Management System which complies with the requirements of ISO 9001:2008 for the following scope: Development, Manufacture and Sale of Pipeline System Products covering: Polyvinyl Chloride (PVC) Pipes and Fittings Polyethylene (PE) Pipes and Fittings Cross linked Polyethylene (PEX) Pipes and Fittings Poly Propylene (PP) Pipes and Fittings Pre Insulated Pipes and Fittings Glass Reinforced Plastic (GRP) Pipes and Fittings
For and on behalf of BSI: Frank Lee, EMEA Compliance & Risk Director Original Registration Date: 04/06/2003
Effective Date: 26/05/2015
Latest Revision Date: 20/05/2015
Expiry Date: 26/05/2018 Page: 1 of 2
This certificate was issued electronically and remains the property of BSI and is bound by the conditions of contract. An electronic certificate can be authenticated online. Printed copies can be validated at www.bsi-global.com/ClientDirectory or telephone +971 (4) 3364917. Information and : BSI, Kitemark Court, Davy Avenue, Knowlhill, Milton Keynes MK5 8PP. Tel: + 44 845 080 9000 BSI Assurance UK Limited, ed in England under number 7805321 at 389 Chiswick High Road, London W4 4AL, UK.
Certificate No:
FM 75767
Location
ed Activities
Cosmoplast Industrial Co LLC Industrial Area No 1 Sharjah 6032 United Arab Emirates
Development, Manufacture and Sale of Pipeline System Products covering: Polyvinyl Chloride (PVC) Pipes and Fittings Polyethylene (PE) Pipes and Fittings
Cosmoplast Industrial Co LLC Branch of Abu Dhabi 1 ICAD Abu Dhabi United Arab Emirates
Development, Manufacture and Sale of Pipeline System Products covering: Polyvinyl Chloride (PVC) Pipes and Fittings Polyethylene (PE) Pipes and Fittings Cross linked Polyethylene (PEX) Pipes and Fittings Poly Propylene (PP) Pipes and Fittings Pre Insulated Pipes and Fittings Glass Reinforced Plastic (GRP) Pipes and Fittings
Original Registration Date: 04/06/2003
Effective Date: 26/05/2015
Latest Revision Date: 20/05/2015
Expiry Date: 26/05/2018 Page: 2 of 2
This certificate was issued electronically and remains the property of BSI and is bound by the conditions of contract. An electronic certificate can be authenticated online. Printed copies can be validated at www.bsi-global.com/ClientDirectory or telephone +971 (4) 3364917. Information and : BSI, Kitemark Court, Davy Avenue, Knowlhill, Milton Keynes MK5 8PP. Tel: + 44 845 080 9000 BSI Assurance UK Limited, ed in England under number 7805321 at 389 Chiswick High Road, London W4 4AL, UK.
Certificate of Compliance This certificate is issued for the following: Polyethylene Pipe (see details on following page)
Prepared for:
Manufactured at:
Cosmoplast Industrial Co., LLC P.O. Box 6032 Sharjah, UAE
Cosmoplast Industrial Co., LLC Branch of Abu Dhabi 1 P.O. Box 8593 Abu Dhabi, UAE
FM Approvals Class: 1613 Approval Identification: 0003055480
Approval Granted: July 20, 2015
To the availability of the Approved product, please refer to www.approvalguide.com Said Approval is subject to satisfactory field performance, continuing Surveillance Audits, and strict conformity to the constructions as shown in the Approval Guide, an online resource of FM Approvals.
David B. Fuller AVP, Manager – Fire Protection FM Approvals 1151 Boston-Providence Turnpike
Norwood, MA 02062
Page 1 of 2
Certificate of Compliance Product Description
Nominal Pipe Size, mm
Rated Working Pressure, psi (bar)
Remarks
Pipe, ISO 4427, SDR9
50, 63, 90, 110, 125, 160, 180, 200, 225, 250, 280, 315, 355, 400, 450, 500, 630
180 (12.5)
a, b, c
Pipe, ISO 4427, SDR11
50, 63, 90, 110, 125, 160, 180, 200, 225, 250, 280, 315, 355, 400, 450, 500, 630
150 (10.3)
a, b, c
a. Dimensions refer to the pipe outside diameter. b. The manufacturer’s butt-fusion welding instructions must be strictly adhered to for a proper t. c. The color of the pipe is black, or black with blue stripes.
Page 2 of 2
7. PREVIOUS APPROVALS
Our Ref: REC/DEWA/CNBG/268 Alstom Ref: CANALBRG/ALST/MASS/DEWA/0053
Date: 26.11.2014 Date: 17.11.2014
ALSTOM Grid SAS-Dubai PO BOX 48957 Dubai – UAE Kind Attn: Mr. Syam Menon (Project Manager)
Project:
HRT/SS-001, Supply, Installation, Testing & Commissioning of Canal Bridge 132/11kV Substation, Sheikh Zayed Road, Dubai
Subject:
Approval for Material Submittals (Code- HRT/SS-001-CANALBRG-MS-C-15-242)
With reference to the above mentioned subject, the following material is approved with following remarks:-
Sl. Name of Material No.
1
HDPE Pipe – (Dia. 160mm/ 9.5mm thk. & 110mm/ 6.6mm thk.)
Source/ Country of Manufacture UAE
Supplier
M/s Cosmoplast Industrial Co. LLC, UAE
Application of this material
Approval Code
On the route of Cable Route Profile
B
Recommended application of the material is subject to following comments. 1. This material is to be used as a sleeve near waterline crossing. 2. Approved sample to be kept at the site sample room as per the sequence of activities being executed.
Abbreviations of Status A : Approved as per sample submitted. B :
Approved subject to full compliance with manufacturer’s instructions.
C :
Approved subject to full compliance with the comments. Resubmit for record.
D :
Representative sample to be prepared at site for final approval.
E :
Comments as indicated in the material comments sheet.
F :
Not approved. Revise the submittal as per the comments and resubmit for approval.
G :
Contractor’s responsibilities for compliance with the requirements of the specification.
Thanking you, With Best regards, For Relays Engineering Consultants
Manoj Kumar Agarawal Manager-Project
for
AS'COM
AECOM Middle East Limited
+971 3 702 6600 +971 3 75 5 4727
.>....:i...ylw.......yI J.y..r~1
PO Box 1419. AI Ain United Arab Emirates www.aecom.com
tel fax
Ref: EB/90825909/M06356
1O)r;@[§ow~rnl
23 April 2013
ltU
2 9 APR 2013
~
At NASR_NG CO. L.L.C. AI Nasr Contracting Company P. O. Box: 2436 Abu Dhabi Attn: Project Manager :...
'.
Dear Sir, 0-10587: Replacement of ON 600 01 Pipeline from Shawamekh RIA to Zayed Military City Material Submittal - HOPE Pipes - ANC/010587/C021/2012 (Rev 2) Vendor: Mis Cosmoplast, UAE
We refer to your letter D-10587.157.2013.MK dated 22 April 2013 enclosing the above submittal for HOPE Pipes. We have reviewed the submittal and found acceptable except as noted. 1. Technical Data Sheet refers the pipe colour as "Black" whereas the Compliance Statement refers pipe colour as "Black colour with blue stripes" as specified; hence acceptable. The technical data sheet should be revised and resubmitted for records. Since HOPE pipes are not available in the Contract BOQ, also confirm that the quantity shall be as per the approved shop drawings. Please note that the item is approved as material only. However the normal procedure of Client approval of new item rates shall be followed.
:l
I()~~"
~~;~
Ammar Wazzan Senior Manager, Water
cc: ADDC : -Water Projects Department Manager -Project Engineer Mr.Hamed AI Mansoori -Projects Engineer Mr.Jassem AI Dhanhani
Q:19082 5909 (DN600 Shawamekh to Zayed)ICorrespondencelTo Contractor· MateriatIY13104.13IM06356 23.04.docx
AS'COM
f;-o'iq..iJJ ~'HI ii..=:,)-iiJ
Abu Dhabi Distribution Co.
Project Title & Ir.nntr",,.t No.
RePlacement of DN600 Pipeline from /Shawamekh R/A up to Zayed Military City
Material Description
Contractor
H.D.P.E PIPES
COSMOPLAST,UAE
Consultant Submittal Aef.No.
SPECIFICATION,W·P·SS·005
")
Manufacturer Quality Certificate (ISO or Other) Copy of Certificates ( Non·Toxicity or Other)
Yes.
Copy of Related Page of B.O.O.
Yes.
Yes.
)
Yes.
Other Enclosure ( if any)
Yes.
I
~mended for Approval
,.--.......,
[
Copy of Previous Approvals
(=:l
Not Recommended
Recommended for Approval as commended
1
For Use of ADDC : Status:
0
Approved
0
Not approved
~ved Except As Noted
Stamp, Signature & Date The above Comments and/or approvals do not relieve the Contractor from his obligation under the Contract to ensure conformance to the specification. Any specification deviations found subsequent to approval shall be corrected by the CONTRACTOR to the satisfaction of ADDC/ENGINEER.