RENCANA ANGGARAN BIAYA (RAB) ( ESTIMATE ENGINEER ) Kegiatan Pekerjaan Lokasi Tahun Anggaran No Uraian Pekerjaan 1 2 I PEKERJAAN PERSIAPAN 1 Pembersihan Lokasi 2 Papan Nama Proyek 3 Sewa Direksi keet 4 Penyediaan Air Kerja 5 Pembongkaran 6 Pelaporan, Dokumentasi II
III
: Pengembangan SAPRAS Kelembagaan Pembibitan Peternaka : Pembangunana Pagar Keliling : Desa Air Bening Kecamatn Bermani Ulu Raya Kabupaten Rejang Lebong : 2008 Analisa 3 Ls Ls Ls Ls Ls Ls
Volume 4 1.00 1.00 1.00 1.00 1.00 1.00
Satuan 5
H. Satuan 6
Unit Unit Unit Unit Unit Unit
250,000.00 350,000.00 1,750,000.00 200,000.00 75,000.00 1,850,000.00
PEK. TANAH 1 Pek. Bowplank 2 Galian Tanah
Ls 6.1
1.00 184.00
Unit M3
350,000.00 14,880.00
PEK. BETON 1 Pas. Pondasi Beton Cor 1Sp : 3 Ps : 5 Kr
5.1
44.70
M3
537,360.00
Ls Ls Ls 6.2
804.00 20,869.68 4.00 384.96
6.1 6.38 6.11 6.14
0.92 1.82 24.50 24.50
1.00
IV PEK. PEMBESIAN 1 Besi. L 6.60.60 2 Pek. Kawat Duri 3 Pek. Pintu Pagar Pipa Galvanis ø 2 " 4 Pek . Cat Besi V PEK. GAPURA 1 Pek. Galian Tanah 2 Pek. Kolom Beton 3 Pek. Pelasteran 1 Pek. Pengecatan Gapura VII PEKERJAAN AKHIR 1 Pek. Pembersihan Akhir
Ls
Buah M' Unit M2
142,000.00 1,400.00 1,150,000.00 13,670.00
M3 M3
M2 M2
14,880.00 2,472,880.00 74,235.00 8,591.00
Unit
206,650.00
REKAPITULASI
RECANA ANGGARAN BIAYA ( R A B ) ( ESTIMATE ENGINEER ) Kegiatan Pekerjaan Lokasi
: Pengembangan SAPRAS Kelembagaan Pembibitan Peternaka : Pembangunana Pagar Keliling : Desa Air Bening Kecamatn Bermani Ulu Raya Kabupaten Rejang Lebong : 2008
Tahun Anggaran No. 1
URAIAN PEKERJAAN 2
3
I PEKERJAAN PERSIAPAN
Rp……………………………..
II PEK. TANAH
Rp……………………………..
III PEK. BETON
Rp……………………………..
IV PEK. PEMBESIAN
Rp……………………………..
V PEK. GAPURA
Rp……………………………..
VII PEKERJAAN AKHIR
Rp……………………………..
Jumlah PPn 10 % Jumlah Total Dibulatkan Terbilang :
Rp…………………………….. Rp…………………………….. Rp…………………………….. Rp…………………………….. ( Dua Ratus Sepuluh Juta Tujuh Ratus Lima Puluh Ribu Rupiah )
Diketahui : Pengelola Teknis Kimpraswil Kab . Rejang Lebong
T U K I J A N , ST
Curup , Maret 2008 Dibuat , Konsultan Perencana CV . t Engineering Consu
IRWANSYAH , ST .MM
Mengetahui / Menyetujui : Kepala Kantor Peternakan Dan Perikanan Kabupaten Rejang Lebong
Mengetahui : Pejabat Peleksana Teknis Kegiatan (PPTK)
Ir . AFNISARDI , MM NIP . 450 006 336
Ir . MUDARLIS NIP. 080 124 022 Mengetahui / Menyetujui : Kuasa Pengguna Anggaran
Ir . ROSIHAN , Y.T , MSi NIP. 080 066 788
RENCANA ANGGARAN BIAY (RAB) Kegiatan Pekerjaan Lokasi
: Pengembangan SAPRAS Kelembagaan Pembibitan Peter : Pembagunan Jalan Lapen : Desa Air Bening Kecamatn Bermani Ulu Raya Kabupaten Rejang Lebong : 2008
Tahun Anggaran
RAB No
SEMULA Uraian Pekerjaan
1
I
2
Analisa 3
Volume
Satuan
H. Satuan
4
5
6
PEKERJAAN PERSIAPAN 1 Pembersihan Lokasi 2 Sewa Direksi keet 3 Penyediaan Air Kerja 4 Papan Nama Proyek 5 Pelaporan, Dokumentasi
Ls Ls Ls Ls Ls
1.00 1.00 1.00 1.00 1.00
Unit Unit Unit Unit Unit
350,000.00 2,250,000.00 150,000.00 350,000.00 2,250,000.00
241.00 1.00 860.00 172.00 -
M3 Unit M2 M3 -
34,580.00 3,800,000.00 74,904.02 242,375.00 -
SLR
530.00
M1
93,391.32
K.224 K.810
107.00 123.50
M3 M3
34,580.00 516,400.00
Jumlah Rp. II PEK . LAPISAN PENETERASI ( LAPEN) 1 Galian Tanah 2 Mobilisasi Alat 3 LPA - Lapisan Penetrasi ( Lapen ) 4 LPB - TELFORD 5 Pasangan batu Kali 1 : 4 6 Galian Tanah
K.224 Ls K . 618 K . 516 K.810 K.224
Jumlah
Rp .
III PEKERJAAN DRAINASE 1 Saluran Air
Jumlah Rp . IV PEK . DINDING PENAHAN TANAH 1 Pek. Galian Tanah 2 Pasangan Batu
Jumlah
Rp .
V PEK. PLAT DUEKER ( 2 UNIT ) 1 Pek. Galian Tanah 2 Pasangan Batu 3 Pek.Rabat Beton 4 Pek. Beton Bertulang
K.224 K.810 K.720 K.710+K715+
9.50 5.90 0.68 1.34
M3 M3 M3 M3
34,580.00 516,400.00 721,513.83 1,533,556.33
1.65 3.11 0.33 750.00 4.00
M3 M3 M3 M' Bh
34,580.00 516,400.00 721,513.83 10,200.00 22,000.00
1.00
Unit
461,530.00
K.720+K.725
Jumlah
Rp .
VI SARANA PENDUKUNG KEGIATAN 1 Pek. Gelian Tanah 2 Pesangan Pondasi Batu Kali 1 : 4 3 Lantai Beton 4 Pek. Pipa 3/4" + Asesoris + Upah 5 Kran
K.224 K.810 K.720 Ls Ls
VII PEK. AKHIR 1 Pek. Pembersihan Akhir
Jumlah
Ls
Rp .
Jumlah = I + II + III + IV + V + VI + VII PPN 10 % Jumlah Total Rp . Dibulatkan
Mengetahui Pejabat Pelaksana Teknis Kegiatan
Ir. MURDALIS Nip. 080 124 022
Tim Peneliti Kontrak Pegelola Teknis Ketua
Drs. DARMAWI Nip. 080 052 883
TUKIJAN ,ST NIP.450003896
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) Kegiatan Pekerjaan Lokasi Tahun Anggaran No. 1
URAIAN PEKERJAAN 2
: Pengembangan SAPRAS Kelembagaan Pembibitan Peter : Pembagunan Jalan Lapen : Desa Air Bening Kecamatn Bermani Ulu Raya Kabupaten Rejang Lebong : 2008
3
I PEKERJAAN PERSIAPAN
Rp……………………………..
II PEK . LAPISAN PENETERASI ( LAPEN)
Rp……………………………..
III PEKERJAAN DRAINASE
Rp……………………………..
IV PEK . DINDING PENAHAN TANAH
Rp……………………………..
V PEK. PLAT DUEKER ( 2 UNIT )
Rp……………………………..
IV SARANA PENDUKUNG KEGIATAN
Rp……………………………..
VII PEK. AKHIR
Rp……………………………..
Jumlah Total PPN 10 % Jumlah Total Dibulatkan Terbilang
Rp…………………………….. Rp…………………………….. Rp…………………………….. Rp……………………………..
: ( Dua Ratus Delapan Puluh Dua Juta Dua Ratus Empat Puluh Tujuh Ribu Rupiah )
Curup , 27 Mei 2008 CV . PADANG ARAFAH
OKTOVANDES Kuasa Direktur
NA ANGGARAN BIAYA (RAB)
embagaan Pembibitan Peternakan
Jumlah 7 250,000.00 350,000.00 1,750,000.00 200,000.00 75,000.00 1,850,000.00 4,475,000.00 350,000.00 2,737,920.00 3,087,920.00 24,019,992.00 24,019,992.00 114,168,000.00 29,217,552.00 4,600,000.00 5,262,403.20 153,247,955.20 13,659.84 4,510,533.12 1,818,757.50 210,479.50 6,553,429.96 206,650.00 206,650.00
EKAPITULASI
embagaan Pembibitan Peternakan
JUMLAH 4 4,475,000.00 3,087,920.00 24,019,992.00 153,247,955.20 6,553,429.96 206,650.00 191,590,947.16 19,159,094.72 210,750,041.88 210,750,000.00
Curup ,
Maret 2008
Konsultan Perencana CV . t Engineering Consultant
IRWANSYAH , ST .MM
bat Peleksana Teknis Kegiatan
engetahui / Menyetujui : asa Pengguna Anggaran
ROSIHAN , Y.T , MSi NIP. 080 066 788
A ANGGARAN BIAYA (RAB)
elembagaan Pembibitan Peternakan
n Bermani Ulu Raya
R A B PERUBAHAN Volume
Satuan
H. Satuan
Jumlah 7
350,000.00 2,250,000.00 150,000.00 350,000.00 2,250,000.00
1.00 1.00 1.00 1.00 1.00
Unit Unit Unit Unit Unit
350,000.00 2,250,000.00 150,000.00 350,000.00 2,250,000.00
5,350,000.00 8,333,780.00 3,800,000.00 64,417,457.20 41,688,500.00 -
5,350,000.00 139.00 1.00 594.00 119.00 57.00
M3 Unit M2 M3 M3
34,580.00 3,800,000.00 74,904.02 242,375.00 516,400.00
4,806,620.00 3,800,000.00 44,492,987.88 28,842,625.00 29,434,800.00
198.46
M3
34,580.00
6,862,746.80
118,239,737.20 49,497,399.60
118,239,779.68 530.00
M1
93,391.32
49,497,399.60 3,700,060.00 63,775,400.00 67,475,460.00
350,000.00 2,250,000.00 150,000.00 350,000.00 2,250,000.00
49,497,399.60 49,497,399.60
107.00 123.50
M3 M3
34,580.00 516,400.00
3,700,060.00 63,775,400.00 67,475,460.00
328,510.00 3,046,760.00 490,629.40 2,054,965.48
9.50 5.90 0.68 1.34
M3 M3 M3 M3
34,580.00 516,400.00 721,513.83 1,533,556.33
5,920,864.89
328,510.00 3,046,760.00 490,629.40 2,054,965.48 5,920,864.89
57,057.00 1,606,520.40 241,616.94 7,650,000.00 88,000.00 9,643,194.34
1.65 3.11 0.33 750.00 4.00
M3 M3 M3 M' Bh
34,580.00 516,400.00 721,513.83 10,200.00 22,000.00
57,057.00 1,606,520.40 241,616.94 7,650,000.00 88,000.00 9,643,194.34
461,530.00
1.00
Unit
461,530.00
461,530.00
461,530.00
461,530.00
256,588,186.03 25,658,818.60 282,247,004.63 282,247,000.00
256,588,228.51 25,658,822.85 282,247,051.36 282,247,000.00
Diperiksa oleh Konsultan CV. T ENGINEERING Const
IRWANSYAH, ST, MM
Curup, 7 Oktober 2008 Dibuat oleh : Kontraktor Pelaksana CV. PADANG ARAFAH
OKTOVANDES Kuasa Direktur
EKAPITULASI
elembagaan Pembibitan Peternakan
n Bermani Ulu Raya
JUMLAH 4 5,350,000.00 118,239,779.68 49,497,399.60 67,475,460.00 5,920,864.89 9,643,194.34 282,247,051.36 538,373,749.87 53,837,374.99 592,211,124.86 282,247,000.00 Puluh Tujuh Ribu Rupiah )
Curup , 27 Mei 2008 CV . PADANG ARAFAH
ANALISA BIAYA PEKERJAAN LAPIS PERKERASAN MAKADAM 5 CM ( LAPEN ) ( MENGGUNAKAN BURUH ) Propinsi : Bengkulu Kecamatan Dipersiapkan Oleh Kabupaten : Rejang Lebong CURUP URAIAN : ANGGAPAN / ASUMSI 1 Seprotkan aspal Tack coat 0,8 ltr / m2 1. Menggunakan Tenaga Buruh 2 Hamparkan Agregat Pokok 3-5 cm 25 m3 2. Harga Material ( Agregat Pokok, Agregat Pengunci, agregat Penutup, dan 3 Hamparkan Split 2-3 cm 45 m3&Padatkan Aspal ) adalah Harga Dilokasi Proyek 4 Semprotkan Aspal ( 2,5 kg/m2 ) 3. Volume Aspal Cair Untuk Tack Coat 0,8 ltr/m2 5 Hamparkan Agregat Pengunci Split 1-2 cm 4. Tebal Lapisan Penetrasi 5 cm 90 m2/m3 dan Padatkan 5. Agregat Dikirin Sampai Lokasi Pekerjaan Oleh Leveransir 6 Semprotkan Aspal 1,5 kg/m2 & Gilas 7 Taburkan Pasir Rata - rata 400 m2/m3 PEKERJAAN P E K E R J A
Mandor Operator Terlatih Sopir Buruh Tak Terlatih Buruh Terlatih
MATERIAL M A T E R I A L
Batu Pecah 3-5 cm Batu Pecah 2-3 cm Batu Pecah 1-2 cm Pasir Beton Aspal Minyak Bakar Alat Bantu PERALATAN
P E
JUMLAH ORANG
HARI
KODE
TOTAL VOL
UPAH
( Orang/Hari )
( Rp/Orang/Hari )
2.00 2.00 1.00 66.00 2.00
3.00 3.00 3.00 3.00 3.00
L.061 L.081 L.091 L.101 L.106
JUMLAH MATERIAL
SAT.
KODE
HARGA
56.00 31.11 15.55 3.50 6270.00 450.00 8.16
M3 M3 M3 M3 Kg Lt Set
M.023 M.024 M.025 M.041 M.061 M.065 M.170
285,000.00 335,000.00 285,000.00 147,500.00 9,000.00 3,500.00 65,000.00
JUMLAH ALAT
HARI KERJA
KODE
6.00 6.00 3.00 198.00 6.00
JAM KERJA
47,000.00 100,000.00 75,000.00 33,000.00 37,000.00
HARGA ( Jam / Hari )
R A L A T A N
Mesin Gilas 3 Roda 8-10 T Sprayer Aspal 200Ltr Dump Truck 3,5 T/ 44 Hp
Volume :
1400
1.00 1.00 1.00
3.00 3.00 3.00
Satuan M2
E.080 E.153 E.211
15.00 15.00 15.00
Harga Satuan
128,324.06 52,016.83 126,468.29
73,093.87
ANALISA BIAYA PEKERJAAN KONSTRUKSI LAPIS PONDASI BAWAH (LPB)-TELFORD ( MENGGUNAKAN BURUH ) Propinsi : Bengkulu Kecamatan Dipersiapkan Oleh Kabupaten : Rejang Lebong CURUP URAIAN : ANGGAPAN / ASUMSI 1 Material Disiapkan dilokasi Pekerjaan 1. Menggunakan Tenaga Manusia 400 M2 / hari 2 Hamparkan pasir setebal 5 cm 2. Material-material dikirim ketempat Pekerjaan Oleh Leveransir 3 Batu pecah berukuran besar 3. Batu sudah dipecah ( 10 - 15 ) cm Disusun berdiri 4. Tanah dasar sudah disiapkan 4 Batu pecah yang lebih kecil mengisi rongga 5. Dipadatkan sampai tebal 20 cm diatasnya shg rata kemudian dipadatkan / digilas dengan mesin Gilas
PEKERJAAN P E K E R J A
Mandor Operator Terlatih Buruh Tak Terlatih
MATERIAL
JUMLAH ORANG
HARI
KODE
3.00 1.00 99.00
1.00 1.00 1.00
L.061 L.081 L.101
SAT.
KODE
JUMLAH
TOTAL VOL
UPAH
( Orang/Hari )
( Rp/Orang/Hari )
3.00 1.00 99.00
47,000.00 100,000.00 33,000.00
HARGA
MATERIAL M A T E R I A L
Batu belah 15 / 20 Batu Pecah 5 -7 cm Pasir Urug Alat bantu
PERALATAN P E R A L A T A N
Mesin Gilas 3 Roda 8-10 T
Volume :
80
SAT.
KODE
HARGA
50.00 20.00 30.00 4.00
M3 M3 M3 M3
M.020 M.022 M.040 M.170
150,000.00 235,000.00 65,000.00 65,000.00
JUMLAH ALAT
HARI KERJA
KODE
JAM KERJA
1.00
1.00
E.080
5.00
MATERIAL
Satuan M2
Harga Satuan
HARGA ( Jam / Hari )
128,324.06
231,995.25
KODE K.618
AAN CM ( LAPEN ) H)
Tanggal :
gat Pengunci, agregat Penutup, dan
aan Oleh Leveransir
BIAYA ( Rp )
SUB TOTAL ( Rp )
282,000.00 600,000.00 225,000.00 6,534,000.00 222,000.00
BIAYA ( Rp )
7,863,000.00 SUB TOTAL ( Rp )
15,960,000.00 10,421,850.00 4,431,750.00 516,250.00 56,430,000.00 1,575,000.00 530,400.00 BIAYA ( Rp )
89,865,250.00 SUB TOTAL ( Rp )
1,924,860.90 780,252.45 1,897,024.35
Total ( Rp ) Per
AAN (LPB)-TELFORD H)
4,602,137.70 102,330,387.70 M2
KODE K.516 Tanggal :
kerjaan Oleh Leveransir
BIAYA ( Rp )
SUB TOTAL ( Rp )
141,000.00 100,000.00 3,267,000.00
BIAYA
3,508,000.00 SUB TOTAL
( Rp )
( Rp )
7,500,000.00 4,700,000.00 1,950,000.00 260,000.00
14,410,000.00 SUB TOTAL ( Rp )
BIAYA ( Rp )
641,620.30
Total ( Rp ) Per
641,620.30 18,559,620.30 M2